Installing underfloor heating in the bathroom with their hands - all the details of

click fraud protection

Warm - floor - in-the- bath - room fact that the bathroom is different excessive humidity, therefore, is a location that requires repairs more often than others - a fact.Therefore, arrangement of floor heating in the bathroom - it's not so much a fashion statement as an opportunity to solve many problems.What?

First , drier air indoors will reduce the likelihood of it dampness and mold.

Second , in the season when the heating is turned off and cool on the street, the conditions for receiving water procedures hardly be called comfortable.And this - the path to the cold.

Third , is not for the private sector is the way to choose a more gentle mode of operation of the heat source, as cold air spread through the house, and the coolant temperature can be somewhat reduced.

Which design to choose a warm floor

in bath - warm - floor expediency of "warm" floor in the bathroom is obvious, but how to apply engineering solutions for installation, a separate issue.It should be noted immediately that the construction is suitable for the individual all the way;the whole thing is only in the "issue price".With a city apartment is much more difficult.On the choice of components we wrote here.

pipe system

The difficulty is that the pipe will have to "hide".So, you will need a fairly thick cement.And this is - the additional roof load.In addition, connected to the central heating system is prohibited because it will affect the quality of the heating of apartments the riser.The fact that there will be problems with the Criminal Code or the neighbors - guaranteed.





can set wall model of the boiler, but is it worth doing it only for one room?Plus - the laying of pipes, connection, installation of valves and fittings.All this will rise "a lot of money."

E / cable (heating)

As an option - "heat tracing" mats.Disadvantages of three.First - tie, though not as thick, will have to do.II - payment system for e / energy "pleasantly surprised."Third - this system limits the choice of the type of floor covering.For example, a laminate (water-resistant) just do not fit.

warm floor

infrared heater

understood the use of the film version.Power had scanty and installation is made under any "finish" finish, with virtually no floor "rises".Hence - the best choice in all respects.For "high-rise buildings," he only acceptable.On installation of the floor heating under the tiles, we wrote here.

Operation

consider only options with cable and film.If in a private house has a system of "warm" floor pipes in other areas, the method of installation in the bathroom is no different.

Substrate preparation

  • Remove the old liner, all clean and wash.Identified defects - cracks, depressurize the joints - to eliminate.
  • Align overlap.The best way - to use self-leveling mixture.
  • Perform waterproofing foundations.As a rule, used film p / e - the cheapest option.

laying

Winterizing floor

It is advisable to choose material with teplootrazhayushim layer.Then part of the thermal energy will not "go" down to the neighbors.Another way - insulation cover with sheets of foil.

Installation IR film

  • material is placed on the base, and then connect devices - temperature controller and sensor.The accompanying documentation is required to have installation instructions.Take into account that the infrared heater should not cover more than half the area of ​​the room.Film equidistance from the wall - about 8 cm stacking technology is clearly visible in the picture..

film

between adjacent strips left a gap of about 50 mm, and they are placed along the length of the room.So it will be less than the cuts and connections.All edges are secured to the base of a building adhesive tape.

  • Checking availability.
  • warm floor is covered film (polypropylene or Mylar) for protection against mechanical damage.Plus - reinforcing mesh.In some cases, if the surface finish suggests "rough" work (eg tiles), it is advisable to make a thin screed.

E /

  • cable cable cable is laid in rows or loops, depending on the manufacturer's recommendations.The figure shows one of the options.
  • sensor is placed in a "corrugated" or plastic tube of small diameter.Its location - between neighboring "wires" in any convenient location.There is a nuance - one end of the tube must be placed above the future ties, or in the event of sensor failure replace it without its partial disassembly will not work.
  • Check of serviceability of all e / circuit.
  • Fill DSP solution.Screed must exceed the level of bookmarks cable at least 3 cm.

mounting Features

  • Switching the system into operation only after 4 weeks.This time is necessary for quality drying floor.Otherwise, tie or give through crack, covered or "cobwebs".
  • regulator should be placed on the wall in a place like this, to prevent ingress of water droplets on it.

In principle, nothing complicated.Individual moments to work with a specific type of products are reflected in the instructions (manual) for the material.Here it is necessary to comply with the requirements and in the first place, especially in connection to e-mail / network.