Construction bath with his hands

Step 1: Building the foundation

Naturally, for any building plays an important role the foundation, which is shipped in accordance with the type of frame and ground your territory.The horizontal dimensions of the bath depends on the material from which the walls are made.

Fig .241-1 Russian bath in a classic video

Foundation - this is not something on which you can save.It is made of the belt type, since it is combined with various types of clay and rocky ground.

basement Height:.. 50-70 cm For loose soil can delve and 80-90 cm Taking into account the location of the groundwater in their standard position is not necessary, however, when too close proleganiya groundwater foundation better lift.

dig a trench for the foundations, and then fall asleep in her podsypku.First, there is coarse sand (20 cm), this layer is referred to as "sand bag".Next sprinkles crushed stone for protection from moisture and amortization.

then need waterproofing blind area - can be done with tar paper, or the more modern waterproofing materials.After the tape is filled with liquid concrete solution for the reinforcement of one part cement and three parts sand.

After preparing the mesh reinforcement of metal rods, wire, profile pieces, corners and other things that should be properly linked together, a little before reaching the finish height of the foundation.Along the tape also necessarily placed vertically 5-6 rebar.

Fig .241-2 Manufacturing of foundations for the Russian baths Fig .241-3 Ribbon foundation grouted

Step 2: Setting the cap

Cap - this is the beginning of the walls of the future premises.It is set on the basis of the foundation and is the basis of the strength of the bath, its protection from external moisture.Between the base and lay a foundation waterproofing layer, which consists of a sheet of roofing material.The plinth is made to floor level.

Step 3: erect "box" bath

Russian bath should be made of wooden logs and profiled bar with a cross section of 150 mm - is the most suitable material according to the national traditions.Working with log cabins require special skills, so it will observe the work of professionals in the video in the next tab.

When the device holes for windows and ventilation conduct a thorough antiseptic treatment.

The tree is known to be the most ecological material, which is convenient and advantageous to finish the bath.If you are finished with the outside of the treated wood, the inside can be used for the harmony of the wooden battens.It is applied to the walls do not rot away from moisture and for the aesthetic effect.Between the ceiling, floors and paneling should be a gap of 1 cm to be able to "play" of the material due to the temperature difference.

Faces near the walls treated with antiseptic.

Fig .Room 241-6 , trimmed clapboard Fig .241-5 bath of pure wood

Step 4: Preparation drain

Cliv created by digging a pit in the middle of the washing room.Size 150h150h150 see. Often, it creates before pouring the foundation, but it does not matter, so work can be done at this stage.Made with metal reinforcement and laying of a small amount of rock.The walls are filled with concrete 30 cm. The pit is hiding under the boards at one week, and then greased with diesel solution.

boards on top of the pit can be put 15 cm thick concrete cover. It also needs to be reinforced, but wire.

to drain the pit main aspect is that the cover is not collapsed inside, and the walls have not started to crumble.

Next trail on the floor and slag concrete block at 30 cm tall.This layer allows insulate the floor to make a fill and service life as long as possible.

Then in the middle of performing a special valve which is attached to the lid sewer ducts.The entire surface is reinforced with wire.

Fig .241-7 Preparing for the bath drain

The next step is to pour concrete on 15 cm.

After put the plate into the hole, which must be less than the pipe sewer drain 15 cm. To start the drain in the winter frosts, you only need to fill in this pair plateliters of hot water.

Do not forget after these works lay around the hole stones from 5 to 10 mm thick, which will increase the strength of the system and safeguard it from exposure to water.

This drain will make your floor very warm, which is useful for the strong winter frosts in Russia.

Fig .241-8 drain option for a bath with his hands

Step 5: the present in the bath

There are several stages in the bath Coanda boards.

  1. on concrete pavement placed timbers thickness of 40-50 cm, they are treated with antiseptic or engine oil.You can also use white spirit.The smell of the oil disappears after the second use of baths, but white spirit is not enough, which is very expensive, so more and longer disappears.

Fig .241-9 laying flooring to cover - lags

  1. These lags placed planks 15 cm wide and 5 cm thick. Installation between the planks should be a gap of half a centimeter.Near the water seal mounted removable hatch in case of an audit or thawing.Paul covers a fugue with a brush and then rub clean cloth.

Important!It is necessary to monitor the uniformity of the coating, since almost imperceptible first defects become apparent after a period of use.

  1. Measured board fastened to the joists with special screws, installation of which does not cause darkening and deformation.The surface obtained is smooth and semi-matt.

Fig .241-10 Fasten the board on the joists

  1. partition of boards is performed for facilities connected to the sink.Set just on the floor and is secured by conventional self-tapping screws and screws.To attach bulkhead linings, after which it is completely ready.