Build Daily

Utility And The Host. Room

August 12, 2017 18:07

Height outbuildings according to SNIP

click fraud protection

Location buildings

necessary to calculate a number of important things, such as where the sun will shine at any given time of the day, whether it will wake you up in the morning, or else will look just before sunset, which will be located playground, parking,the main path to the house, and much more.

The visual design of the site

breakdown situation of premises in your area - this is the first stage of construction, when only need to make to start a project from paper to reality.In this case, in the first place will help you tape 20 meters dimensional triangle with sides 5: 4: 3, boards and poles 1.5 meters, the pegs - 50 cm, steel wire or twine..

Breakdown space situation in your territory

It should also consider all the exits and entrances for cars, but also for special service vehicles.

Includes consolidation in the project house and outbuildings, all the elements and components.A must for the start of the transfer is the foundation of the main dimensions of the land.This can be done using the above poles and columns, at a distance of one to two meters can be installed castoffs.It castoff after nailing wooden boards, which serve as the determinant of the size of trench excavation and foundation dimensions.The red line the streets and the facade line is aligned in relation to each other and with neighboring buildings.

legislation of the Russian Federation to the Town Planning Code of 5.7.98 number 73-FZ, Article 1 (NW, 1998, number 19, st.2069 stipulates that for the "red line" can not intrude any structure of the quarter, andthis line separates the driveway and street in the whole of your building.

All notes with a drawing is transferred to the area without changing, because you'll need a tape measure. angles are given due pantometru and theodolite. They require a follow-up inspection.

Now we talk about standardsthe construction of residential houses and outbuildings. Many mistaken, believing that buying a plot of land, they are free to do anything. This is so only partially, as you follow their desires, you do not dare to forget about the rules SNIP, for non-compliance of which you happencompletely redesign your shelter. you do not even imagine how it is to move the construction of the house with finished basement. you will not be able to register it, if built in one meter from the fence.Therefore, compliance with the rules of construction of houses and built-up only in your best interest.

Mostly you have to pay attention to the location of economic court, the entrance to the estate, because these components are not built primarily for one year and must comply with sanitation.

So, a few unwritten rules:

  1. House should be in 5 meters from the "red line" and at least 3 meters away from the street.
  2. distance between the living room and adjacent areas SNIP should be from 6 to 15 meters.
  3. distance from the walls of the house to the fence should be at least 1.5 - 2 meters.That is a complete orientation to the neighboring homes.
  4. For business areas are subject to the same rules as for the residential houses, only their often placed in the back area near the house or remotely.
  5. fact, as the site is shielded from the street should be clearly indicated in the building plans, so if you decide to do a garage with access to the street, it does not stand up the red line.
  6. On the territory of the site allowed the installation of street toilets.
  7. Buildings familiar way for the animals must have a height of at least 2, 4 meters from floor to ceiling.
  8. For trees in the village also has a landing rules.They should be at least 5 meters from the house, at 3 meters - from the neighboring areas, and 1.5-2 meters - from underground networks, on the 4 th - from street lighting.Shrubs - at a distance of 1-1.5 from houses and other areas.

Location buildings

The rules are simple building in compliance

main documents used by the site owner, who decided to start building this SNIP SNIP 2.08.01-89 and 31/02/2001.These documents do not have something to limit your imagination and possibilities, not respecting the recommendations can optimize the area of ​​your site.Increase home area, you'll have no problems, but the decrease below the permitted standards you will not leave.

minimally acceptable standards recorded by BTI:

  • living room -12 m2.
  • bedrooms - 8 m2.
  • kitchen- 6 m2.
  • Bathroom 1,8 m2.
  • Toilet - 0, 96 m2.

These dimensions are installed in accordance with all known health and safety standards and typical designs of furniture and appliances.Roof house can be built with smaller areas.

Inside the house

House area

This section should just remember a couple of truths, which, incidentally, sometimes even an engineer BTI does not know (alas, is not uncommon in our country).The area of ​​the whole house is calculated by summing up all the rooms and floors, including balconies, loggias and staircases.But at the same unheated attic, basement and cellars are not included in the area of ​​the house.

Monitor the counting process and remember that for every square meter of you happen to pay utility bills.Every detail is important.

instagram viewer