Rules for location plan of power receivers

click fraud protection

Rules for location plan of power receivers

That includes electrical network deployment plan receivers:

  • Show on the plan attached power receiving units and units, it is usually project or already constructed residential facility, as well as storage or office spaceindicating the opening (TA) or input - switchgear (ASP).
  • plan depicting the precise wiring of power energy underground communications;Location
  • other consumers of possible accession of the building to energy services, which include systems and transmission support
  • exact boundaries of the land area of ​​the owner or builder of a building complex, with reference to the plans of the cadastral service.
  • order that would of power consumers to interact with the surrounding infrastructure necessary to make a topographical survey on a scale 1: 500 using the MCS-50 coordinate system

правила-оформления-плана-расположения-энергопринимающих-устройств-1

location plan Example of power farms

For example, here is the deployment planpower receiving apparatus, which is a diagram of connections and supply lines of the outgoing industrial complex.

правила-оформления-плана-расположения-энергопринимающих-устройств-2

Situation

plan Apart from the main documentation Connection of power facilities in the project are working well and the plan, which shows all sources of provision of heat and water supply, as well as the nearest power line communications (air and cable).In fact, the situation plan - a map of the area with a list of geodetic development on the site of construction of a new industrial building.
If a new site location is already registered in the State Real Estate Cadastre, when issuing documentation does not take more than a day.But otherwise it will be necessary to call a specialist from the Inventory service for measurement to obtain the necessary coordinates of the area.It is worth noting that the compiled and signed the plan does not give grounds to carry out the construction.

list of documents required for obtaining a situational plan in the Moscow region:

  1. Letter - application.
  2. Uncertified copy of one of the following documents:
    • document confirming the right of ownership;
    • legal act of the prefecture;
    • contract for the right to lease land
  3. plan - diagram indicating the boundaries of the object.

Below is a sample registration plan in the city of Moscow.

Rules for location plan of power receivers