order to ensure their own home water for drinking, irrigation and other household needs, for a long time developed a proven method for extracting water from the soil.This Abyssinian well, the quality of water which meets health standards.The main thing when you install the well to follow the rules of technology.Operation of a water well does not require specific skills - able to extract water, even a child.Set the column can be as open area, and within any room home, shed, basement.Installation Technology Abyssinian well simple and accessible to any man.

Building Abyssinian well with their hands

Building Abyssinian well with their hands

Provision for Abyssinian well

Set a point well possible at the site where the aquifer lies not less than 9 meters from the ground.Its depth, for sure, known to neighbors who have wells.

Another important factor is the composition of the soil.Land should be sandy or consist of a mixture of coarse sand and gravel.Punch stony ground without the involvement of specialized equipment will not work.

Components Abyssinian well

• The tip of hardened steel.

• Filter fine lattice.

• receiving water valve.

• Main - collection pipe that supplies water.

• Couplings for pipe lengths of jumpers.

• Seals made of rubber.

• Pump for manual pumping piston mechanism.

skeleton Abyssinian wells is done by using one- or two-inch pipe that is driven into the ground.

downhole tubing must necessarily have a larger diameter than the well pipe.If this condition is not met, the pipe movement to the depth becomes impossible.

• For primary water filtration on the pipe is necessary to drill holes of 10 mm in a staggered manner, indented two feet.Parts should not otherwise pipe loses rigidity.

• On the bottom edge of the pipe screwed tapered sharp tip whose length is 200-300 mm.The tip must be made for slits water.Next, a perforated pipe stainless wire wrap should then apply a stainless steel mesh, or plastic mesh.Thus, you get a filter that removes the fine sand that causes the silting.

soldered metal mesh must be special flux or tin solder, lead-free.Do not use substances, poisoning the water.

• The place chosen by the well, it is necessary to choose the soil in a hole with a diameter of one meter.

• The first pipe, pipe, is driven into the ground with the help of women or iron rod blows.In the future, it is screwed into the ground using the drill frame.It is necessary to constantly extract the breed.

• After you install the first section of the pipe, it should be strengthened in the pit, the earth around it compacted, podsypaya ground.On the lower section of the end of which is threaded, screwed the next segment of the pipe.Then screwed next and so on.The total length of pipe corresponds to depth of the water reservoir.When the filter drops to water veins in the mine water will rise by one meter.

Locations pipe connections should use sealing gaskets, otherwise, will occur leak of water, which will certainly affect the efficiency of well operation.To ensure sufficient strength in the joints of the pipes, it is necessary to use hemp linen soaked in oil paint.

Further actions are performed in the following sequence:

• washed with pressurized filter from clay.

• The upper end of the pipe is installed water pump, which facilitates recovery of the water depth and pumps ground topsheet before its complete clarification.Secure pump can be via a flange to the casing, or a threaded connection.

During installation you need to constantly monitor the water level.

When the water rises, it is necessary to think about the tightness of the pipe connections that may be affected due to their depressurization or well plugging.couplings should be installed not cast iron and steel, which have a high quality thread.

Ready -to-use source

Ready-to-use source

Benefits Abyssinian well

in favor of the installation Abyssinian well illustrated by the following factors:

• Simplicity of design.

• Installation does not require much space.

• It is not necessary to attract a special technique, that requires access roads.

• It is possible to install the pump, not only in the open space, but also indoors.

• Fast work at all about all takes no more than ten hours.

• Durability of the operation.

• Surface contamination do not fall into the well.

• With Abyssinian well implemented water supply in continuous operation.

• The cheapest project, unlike others.

• Easily removed and transferred to another place.

To waste water is mixed with the drinking water, it is necessary to equip the well with concrete foundation, towering above the ground.Water from the Abyssinian well in quality is not inferior to spring.