Build Daily

Schemes And Wiring

August 12, 2017 18:06

The layout of pipes in the bathroom

click fraud protection
The layout of pipes in the bathroom

layout of pipes in the bathroom

Typically, major bathroom renovation involves the complete replacement of all existing communications.However, the complexity of the repair work is that is not always possible to simply replace the old equipment with more modern counterparts.The fact that innovative devices differ not only in design but also its size, and therefore it is necessary to develop a new routing scheme suitable for sanitary devices selected.This process is performed also in the case where the plumbing installation made "zero".

correct choice pipes

Selecting components is a very important step in the implementation layout of pipes in the bathroom.Currently, there are few of the most suitable materials from which the pipes run - plastic, copper and polypropylene.The pipeline of copper sufficiently cost and installation of such pipes can be done only by qualified professionals.

pipes of metal is much easier to install, and the price of such a pipeline is dependent on the number of fittings used.The process of mounting a metal-pipe is that it is necessary to accurately measure pipe segments properly fastened together by means of fittings.Correctly perform such work could even a novice.

As polypropylene pipes, they are low cost, but a wiring installation requires not only a certain experience, but also a special tool.

a provisional scheme

Before you start calculating the wiring pipes bathroom, you should decide on the most convenient location and its dimensions bathroom fixtures.With precise measurements necessary to determine the type of designs, then you are ready to implement the scheme wiring pipes.

Pre- wiring diagram of the pipes

Pre-wiring circuit pipes

experts offer the following methods of wiring Today:

  1. - collector;
  2. - consistent;
  3. - with passage outlets.

Given that the latter method is rarely used, pay attention to the rest.

collector wiring pipes

collector wiring is more complex, and therefore it should perform only by qualified personnel.This option involves the installation of shut-off valves on each pipe leading to the sanitary appliance.In this case, it is possible repairs any single element without disabling the entire system.

When the collector circuit wiring is made summarizing the individual section of the pipeline to each santehpriborov.This helps to more evenly distribute the water at the point of consumption, however, increases the flow of material.

Driving collector wiring tubes

wiring diagram collector pipes

Serial wiring pipes

Option serial wiring tubes is characterized by its simplicity - the main pipeline passes successively from one to another santehpriborov.The main disadvantage of this scheme - is not enough uniform distribution of water pressure in the case where all devices run simultaneously.

rules and works requirements

High-grade wiring must always meet the following requirements:

- be reliable;

- provide quick disconnection of water supply in an emergency;

- to guarantee the protection of the pipeline from leaking;

- ensure the smooth functioning of all santehpriborov;

- have enough aesthetic appearance, not without creating unnecessary projections surface.

Two ways pipeline

pipeline layout in the bathroom, involves the use of hidden or open pipe-laying methods.

open wiring pipes

should be noted that, although the outdoor version is much simpler, it is not always satisfied with the owner of the apartment, as all the pipes in this method are in sight.

Hidden wiring pipes

Hidden method involves laying a pipeline in a special niche, which can then be plastered, thus making invisible tube.The main disadvantage of this method is its complexity.Shtrobirovanie, which is a preparatory stage hidden wiring can not be carried out in the supporting walls.In addition, the pipe connected only in accessible locations, a main conduit extending inside the wall, always follow the whole.On those pipes, which are supposed to wall up into the wall, put on a special gofrorukav, protecting them from mechanical impact, compensating thermal expansion pipe hot water supply and protection against condensate pipeline, which supplied cold water.

Installing a pressure reducer and a filter

pipework bathroom necessarily begin with the control valve assembly.As is known, the quality of water supplied to the water, in the CIS countries do not comply with European standard indicators, so it's best just behind the valve, install a strainer.After installation, the filter can be installed counters showing the water flow.After the counters can be set fine filter.In the water main where water pressure may exceed the allowable limit pressure set special reducer.

Mounting pressure reducer

Mounting pressure reducer

Video - for the work

instagram viewer