Build Daily

Floors

August 12, 2017 18:07

How to pour the floor in the apartment

click fraud protection

Why need fill

Fill is performed to the surface of the alignment device heat and hydro insulation.Pouring itself is performed in several stages, which include:

  • Surface preparation (leveling plaster)
  • Stacking waterproofing
  • Insulation
  • Check evenness
  • Laying mixture (usually concrete)
  • Fill screed.

Doing their own hands

device such ties has several advantages:

  • aligns differences between the plates
  • water resistant.
  • resistance to rotting.
  • possible device on top of a heat insulator.

With a large number of benefits, flood floor technology has virtually no drawbacks.

The pour floors

The pour the floors in the apartment, such as the interesting question as how to fill the floors in the apartment.There are several options.Typically, the floors are filled with concrete mix.It can be as finished and manufactured independently.The second option would save a tidy sum.

also a special concrete composition, which is filled with a thickness of 0.5 to 1 millimeter.

preparatory stage

To start, you need to clean the old surface of the base.Clean all debris, dust;degrease the surface.


next step, you need to be primed base.Priming is done in 2 roller layer.You can also putty with a brush, but it does not give the optimal variant.
After priming must pass at least a day to proceed to the next step.
At the end of the day, if necessary, make the installation of waterproofing.As a rule, it is arranged in a location where there are large gaps, adjacent sewage pipes or heating.Pre places processed bitumen or sealant.Also can use compositions including epoxy resin.
Waterproofing is required in toilets, bathrooms.

Example flooring in the bathroom

After laying waterproofing proceed to a certain height.This is a very important point.Accurate knowledge of heights help to avoid overspending of the material.Usually modern laser equipment used.For convenience, you can pull a string or put rail, not to be mistaken with the most casting floor.
If you are going to pour the floor in the bathroom or the toilet, remember that the floor level must be below the threshold.It is essential that in case of an emergency water could not seep into other rooms.
Before starting work far away from the pipe, it is desirable to cut off the water, or better yet ask to disconnect the riser.
Important!Filling is made from the back wall to the door.The work is desirable to produce together.One person preparing the mixture and pour it into the next overlap with the previous portion.Second leveled it and spills along the walls.
best option fill -. Strips of small width, 30-50 cm fits mixture of medium thickness.Too little will lead to a layer of the floor can not withstand future loads.Too big - the mixture is dry inside.

An illustrative example of the use of rails

sex Pouring keramzit

To begin with, what is the concrete block.This material is obtained by firing clay.It is of three kinds, depending on the size fractions:

  • Sand - 0.1 - 5mm
  • Gravel - 5-40 mm round shape
  • Rubble - 5 - 40mm irregular shape

Pouring floor of expanded clay will give you a warm parquet,ease of pouring screed and flooring installation.Also, expanded clay, almost irreplaceable, at warming wood flooring.
itself sex casting technology with expanded clay is not very different from the usual floor fills.Only in this case you must install the rails and concrete block to fill up to the mark.Filling is done uniformly on the perimeter.After the concrete block filled with cement milk, then the mixture should grab.The setting time from one to two days.

How to pour the floor in the apartment

In modern homes as foam is poured a mixture of uses.But if in the future, you sell the apartment, and the future owners addressed perezalit floor, then they will have serious problems.
you Also, problems may arise if the level difference is very large.For large drops kindly consider all future designs.If you do not, and will not stand in the ceiling neighbors, then it is necessary to torment the neighbors and the district.

The use of expanded clay

Conclusion

Priming flooring has many advantages, it will provide a flat and smooth surface, which is very convenient to lay the tiles, spread linoleum or laminate.
With regard to the process of work, though he is not complicated, but rather laborious and responsible.Pre-payment is recommended to perform the necessary material and calculate future costs.Good luck!

instagram viewer