Build Daily

Cesspit And Drain Hole

August 12, 2017 18:06

Sewage in the bath with his hands - the water drain device

click fraud protection
Sewage in the bath with his hands

Sewerage in the bath with his hands

Any modern residential building, whether it is a private house, cottage or room, is in need of sanitation.As to the whole building, this functional part must be approached with the utmost seriousness.Seriously, I have to know in advance that sewage waste will not be sent to a designated tank and still do the work on the boom?No!Therefore, we must look into the matter thoroughly.Is it possible to make the water drain in the bath with his hands?Yes!

Sex in the bath of the stele in the first place.For a start will have to spend a quality water supply and sewage removal.Resilient flooring in the bath is required.With slits between the boards can be sorted out, tightly clutching deliberately leveled wooden beams.The slope of the floor is required to be sent to the discharge side, not to overdo it, otherwise it will be safe to move around bannomu or shower rooms.The grille covering the drain gutter is installed at the end of the floor assembly.Water from the trough will flow to the sewer pipe and further over it to the drainage well.Pipes for this case is better to take asbestos or galvanized iron.If finances allow, you can buy stainless steel pipe.Important not to plastic, or due to the hot water may deform.

Well Sewer

Drain well to dig near the baths.Two meters from the building should be sufficient.The dimensions of the pit may vary based on the calculation of the intensity of use of the shower and, depending on the soil characteristics.If the ground freezes to 70-80 cm, the depth of the pit with a width of 1x1 meters should be 1.30 - 1.80 m

bottom of the well is filled with gravel, expanded clay or other material that has drainage properties..filling level is also dependent on the level of frost - if the ground freezes to 60 cm, it is necessary to go to sleep about 1 m of drainage material.The remaining space is filled with soil and tightly compacted.Quality work - this is the most important condition.Breaking drainage technology, can provide a full bath on the closure of the cold season.Damp wood not one - the floor will quickly deteriorate if be chilled.

The figure shows the ideal sewerage scheme for the bath

The figure shows the ideal sewerage scheme for the bath

system forward flow

low permeability of water through the soil can be a valid reason for refusal from the pit to collect wastewater.In this case, the forward flow will help.In this method involves the extraction of waste water beyond the bath.To organize this venture, you need to dig a pit, which can be made from virtually any material at hand.An important condition for it is a leak, or you can provide all the "floating noses" unpleasant odor.From the pit water will flow down the slope.Such constructions must be equipped with a water seal.

Water trap

Entering overflow pipe runs at a height of 10-12 cm from the bottom of the pit.To set her plate (without bottom fastening) on ​​three sides.This plate does not reach to the bottom of approximately -6 cm. So the water trap and forms.It does not smell climb back into the bath.

That is important, because it is equipped with sewer vent stack.All the same asbestos or metal pipe that is perfect.Diameter of not more than 10 cm. The top of the tube to install the cap.

polyethylene pipes with high density are the most effective material for sewage.When using this versatile material can be connected to the sewer steam room, dressing room, shower room and even bathroom.

Three bathhouse sewerage

connect to the public network, or gravity-flow water drain system can be made with your own hands.To mount the internal sewage system nodes can be used thin-walled (3.6 mm) non-pressure pipes made of plastic (diameter 60-100 mm).Linking them together should be specifically designed for that seals to the tightness of the entire system is not compromised.The higher the density of the pipes, the better.

The layout of drain should be done with the least possible number of branches.Sewage collector output from the premises in an exhaust pipe, recessed into the ground (below the freezing level).From the branch pipe drains fall into the well, and then into the sewer network.

Video - Installation of sewer pipes

instagram viewer