Build Daily

Bathhouse

August 12, 2017 18:06

How to pour the floor in the bath More Technology

click fraud protection
For us

bath of ordinary human needs in health has evolved into a kind of relaxation, designed for both body and soul.But in order to Bath gives us pleasure, it is necessary to think carefully and competently to build.

Here you have a question: what do the floor?From the tree, of course, prompt you, because everyone is doing it!But in fact, better pour the concrete floor - it is more convenient, and more durable.Of course, the concrete floor will need to be further than a cover - wooden bars or cork mats.Their advantage is that they are very convenient to dry.

How to pour the floor in the bath

How to pour the floor in the bath

characteristic that the floor can be poured concrete only in washing and steam room, all the other rooms of the floor must be wooden.Pour half bath - a procedure time-consuming and expensive, but this coating will serve you all the same order of magnitude longer.

STEP ONE: PREPARATION WORK

To begin with, we note that if the ground under the sand bath (read: absorbs moisture), then the washing must dig a drainage pit in which to accumulate water.If the land is clay, then we need to dig a little pit, from which the pipeline will be carried out.It will take place under the foundation and remove the water in the gutter.At the end of the pipeline make the shutter, so that the bath did not receive unpleasant odors from the waste pits.The walls of the pit can be finished with concrete or tiles, about 5 cm., And the top put a metal grille.

Cooking basis for future sex

When the drainage hole is ready, we have to prepare the ground for future sex.To do this, follow these steps.

Total floor creation scheme in the bath

Total floor creation scheme in the bath

  1. Seal the ground and slightly tilt it towards the pit.Then poured on top of the fifteen centimeter layer of gravel.Along the foundation spreads clay bowl.When all the layers are laid, we again carefully tamped it all.
  2. recommended concrete layer to do a double, so in the steam room and washing was warmer.The first of the layers should be no more than five centimeters, traditionally, with the slope towards the pit.However, where the concrete docks with walls, we fill the bitumen in order to avoid water seepage.
  3. Dai first layer some time to pour.Thereafter, the insulation layer is placed, it can be either mineral wool or felt normal.If, however, the choice fell on mineral wool, it should be protected from moisture - it is shrouded with roofing material.
  4. When insulation is installed, we will fill the second layer of concrete.It has to be reinforced and this is ideal mesh-netting.When the concrete is compacted, it is applied to the cement mixture, which need to properly align with a small piece of board.
The sequence of stacking of layers

sequence of stacking of layers

STEP TWO: Prepare a solution for filling CONCRETE FLOOR

Now I would like to talk a little bit about how to prepare the concrete mix properly.Firstly, it is better to add expanded sand, which will add to the future reliability of flooring.In addition, this sand has excellent thermal insulation performance that is ideal for pouring the floor in the bath.You can also use perlite instead of sand, it has similar properties, it is slightly better than him, but the procedure of preparation of the solution to it has its own peculiarities.

Concrete floor bath

concrete floor in the bath

So, what you need to know.Perlite - is not nothing but a light sand, so that the jobs should be well protected from the wind.Why - I think, you can guess.So, we proceed directly to the preparation of the solution.
  1. To begin to make a dry mixture, in order to fill it in the mixer.Fall asleep 2 buckets of perlite or sand and fill all 10 liters of water.Stir this notice that the amount of perlite is decreased gradually.This is normal, because it absorbs moisture.After stirring 5 liters of cement.Another 5 minutes mix, topped up with 5 liters of liquid and continue the procedure.
  2. So, wait, when the mixture is smooth, then go to sleep an additional 2 liters of water and 10 kg of sand.Again stir until the mixture is free-flowing.Then, stop the mixer for ten minutes, but you can not add water under any circumstances.When the time has elapsed, the process is resumed and continues as long as the excess fluid and does not stand out, and the solution is "like plaster."
  3. Puts the mixture on the flooring baths.Make a tie, finished the job, and carefully leveled surface.Do not forget that it is tilted.To pour the mixture will take five days.Yes, it's long, but the result will delight you.

    Fill the floor in the bath

    Pouring the floor in the bath

STEP THREE: how to deal with SURFACE NEXT?

can put on already dried screed ceramic tiles.When it comes to washing, is knowledgeable experts recommend using it metlahskoy tiles for her.If so, then the concrete screed should be applied to dry cement, approximately ½ kilogram per square meter, and then goes directly to ceramic tile.We laid her gently, firmly while pressing.Then we wait for a couple of days, and only then plastered seams between tiles the cement mixture.

We put tiles as topcoat

Puts tiles as topcoat

There are other people, it is strongly recommended to put in the washing room tiles.We do not quite agree with this, because the tiles, in spite of its excellent hygiene and external characteristics, is however, very dangerous in terms of the trauma.In other words, it can easily slip and fall.

What you can not do in the bath, in particular, in the washing room, so it is covered with synthetic material floor.For example, the same laminated under heat often emit harmful substances to our body, which we breathe in when visiting the baths.They may also be absorbed by human skin.

as prisoners.IMPORTANT TIPS FOR CONCRETE FLOOR pouring

Now I would like to examine in more detail so important a question as pouring the floor in the bath.This procedure makes it difficult to many, many, thinking on this subject, and did not even know that the floor fill is easy to implement on their own, in addition, in record time.The mixture we serve DSP (or, in other words, a mixture of cement and sand), but if on top of the concrete surface in the future will be laid ceramic, we can come and easy concrete mix which is sold in any hardware store.So, what advice we would give you?And here they are!

  1. To begin with, the recommended proportions.Number of cement covering plays an important role in filling, so it should be carefully calculated.In general, one and a half square meter requires one bag.Regarding the tools, that all of them, you can just as easily be purchased at any specialty store.
  2. If the tiles - this is your final decision, we recommend using the special self-leveling screed, they are in addition to the standard cement is also composed of gypsum and anhydrate.
  3. Pour follows from the corner, the most remote from the entrance.Ideally, it is necessary to engage an assistant who would prepare and transmit to you the solution at the time, how will you implement immediately fill.All excess mixture should also be moved to the entrance to the place where filling is not done.The main condition is a continuing process, once laid one layer followed by laying must begin instantly second.Start pouring the floor
  4. Next, you'll notice that the fill dries in one or two days, you may even seem that the floor is already possible, but it is wrong.Ideally it another seven days should not be exposed to severe stress, and even better - two or even three weeks.In addition, during the drying screed needs a couple of times a day humidified, so that it is not cracked in the future.
  5. If you do not want to wait so long, we have great news for you - this can be avoided!To this mixture during manufacture it is necessary to add special substances called plasticizers.They are easy to bind all of the elements of the solution that would prevent surface cracking during emergency operation.Moreover, at times it will increase its strength and durability.
  6. When screed is dry, you might be wondering how well you have done all the work.You can easily find out if the resort to uncomplicated tests.To begin with we define how uniform tie, this can be done by its color: if it is monotone gray, it means that you have worked on glory.Regarding the strength, it is checked commonplace hammer: if after hitting the surface is practically not affected, this means that with the strength of the coating everything is fine.Finally, quality is determined by how large the gaps were obtained: if they are smaller than 0.4 cm, which means you can sleep peacefully and contentedly.

Video - how to pour a concrete floor

instagram viewer