Build Daily

Engineering Systems

August 12, 2017 18:07

When will give heating in Kaluga in 2015

click fraud protection

As Kaluga prepares for the heating season 2015?

In autumn reduces the temperature in their homes, which means that the people do not stop to ask, "When in Kaluga will give heating," the official said is quite predictable, all've already learned that the heat comes in the apartment when the outside temperature does not exceed8 degrees for 5 days.

Residents Kaluga waiting for the start of the heating season

on the main indicators of the level of preparation of the housing stock is at the moment 98%.Already in the 19 areas for the winter boilers prepared, in 17 of them made plans for the repair of water pipe networks.The budget allocated for this purpose more than 50 million.From readiness of objects of municipal and housing depends on the city, when the need to give heating in 2015.

In Kaluga worked to pressure testing and flushing of the heating system

thoroughly prepare for the heating season and in the field.About 20 settlements have been transferred to the house heating system.In the future this figure will only increase.By the end of September to finalize the planning of all facilities of the city, as well as military camps, which are located within the area.

received certificates of readiness, all these institutions have confirmed the end of the preparation for the winter season.When include heating in Kaluga, first heat to give medical and children's institutions.From October 1, will provide warmth and housing.

In Kaluga, in the near future it is expected cold snap

From that graph of heat flow depends?

Dates inclusion of heating systems in Kaluga depend on a variety of factors, chief among them:

  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

Kaluga city administration has allocated in 2015 for the repair and maintenance of heating systems, more than 500 million rubles.

today to start heating 98% of consumers are prepared.Repair and preventive measures are carried out on time.

supply heating Priority Kaluga

Traditionally, the first heat will have social institutions:

  • orphanages;
  • school;
  • hospital;
  • kindergartens.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

room temperature Celsius
optimal permissible
Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

What if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.

instagram viewer