How Tula prepares for the heating season 2015?

After heating season has been completed (end of April) began testing and repairs wear and heating mains in the city.Such premature work on the preparation of a new cold season will help make boilers run exactly as scheduled.

coolant temperature control

From that graph of heat flow depends?

Dates inclusion of heating systems in Tula depend on a variety of factors, chief among them:

  • Average temperature readings;
  • Preparation and maintenance of public utilities;
  • Available budget for the operation of high-quality boiler.

today to start heating has been prepared more than half of homes and institutions in the city.Repair and preventive measures are carried out on time.With the onset of the fall season carry out a thorough check heating systems and boilers.In areas requiring improvements, troubleshooting, which are then thoroughly tested.It is this attitude of utilities lets get started heating systems exactly as scheduled.

Cold batteries

supply heating Priority Tula

Traditionally, the first heat will have social institutions:

  • Kindergartens;
  • College;
  • Hospitals;
  • State institutions.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

Room Celsius temperature

optimal

permissible

Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

Whatdo if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

Starting the boiler

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.