heating boilers are most often used in private homes.In the structure of the set of instruments of the system, each with a specific function.In order to protect the system from overheating, and to ensure effective distribution of thermal energy applied strapping system.The materials used in the piping of the heating boiler can be different, differing availability, durability and quality.High-grade piping will increase the maximum efficiency of the boiler, will prevent the temperature difference at the inlet and outlet.

Types of heating boiler piping circuits

Such schemes are only four: forced (through the use of a circulation pump) or natural circulation of coolant (the easiest of all the options), classic collector layout with many elements (valves, gate valves,drain valves, air) or primary-secondary rings (using several circulation pumps).

Stages self trim boiler heating

Driving home heating

Driving home heating

strapping, depending on the type of heating circulation can be forced or natural movement of the coolant along the contour.The main part of the heating system - it is the boiler.From the type and configuration depend on the nuances of strapping.

Materials Needed: circulation pump, thermal head, balancing valve, expansion tank, pressure gauge, drain and ball valves, globe filters, valves, couplings, clamps, tees, angles, tubes.

Procedure :

  1. - are building the foundation of a thickness of about 10 cm, it laid a sheet of iron or asbestos;
  2. - connect the boiler to the chimney, sealing it;
  3. - mount hood;
  4. - set the boiler manifold, thus it is necessary to identify exactly where the feed line, and where the reverse (usually on the header for this special sticker);
  5. - attach to the boiler a tube diameter of 1.25 inches, and the pipeline system, enter 1 inch diameter pipe, close the other holes with plugs;
  6. - set the mixing valve to the inlet manifold to regulate the temperature;
  7. - mount on the back line circulator, taking into account all the features of the existing equipment;
  8. - set unit temperature control and pressure control (valves, thermometers and differential valve).
Driving strapping heating boiler

scheme tying the boiler heating

cases requiring the installation of reserve boiler:

  • - very low temperatures at which heating is required;
  • - the presence of PETN;
  • - with gas heating to prevent sudden disconnection or lack of power;
  • - at planned power outages.

Features strapping wall boiler heating

a wall heating boiler floor heating can be connected, hot water and heating.Tying the boiler, located on the wall due to its own characteristics:

- the application of the system with one circuit need to follow the procedures outlined in the instruction manual and installation;

- by using dual-modified piping arrangement can be mixing (regulation of the burner and the mixer servo) or direct (only through the burner).

Tying heating boiler - enough time-consuming and complex process that requires care and accuracy.With proper installation of the heating system service life is long, and the operation will not cause difficulties.Use quality components and equipment that is not to save on quality.

recommend that you read about: combi boilers for heating homes, heating boilers Korean.