Build Daily

Walls

August 12, 2017 18:06

Laying nets for aerated concrete with their hands

Laying nets for aerated concrete

Laying nets for aerated

Laying nets - reinforced concrete structure is designed to strengthen the walls of the house from different loads, which arise as a result of the deformation under the influence of both external and internal factors.It can be attributed to external factors, the effects of wind, floating ground, house set on sloping terrain or on a hill and of course the seismic activity of the earth.The internal factors include the installation into the wall studs and other household appliances building right in interior decoration at home.As a result of these phenomena of aerated concrete wall can not withstand the load and just simply disperse or crack.In order to avoid such trouble happened professional builders do Laying nets, to increase the strength of the house.

Laying nets set across the area of ​​the house if the house is made up of modular elements.Typically, it is set between the floors and the roof immediately before the installation, it is done to the walls are not dispersed under load mass on the walls of the roof.Thus, the roof does not come off from the house when properly installed Laying nets.

Installation Laying nets with their hands

Laying nets can be set with wooden obalubki and using dobornyh blocks (about 10 cm) thick.Let's analyze step installation Laying nets using the second option.So: buy final assembly units in our case we do with the outside (from the street) block 10cm and glue it to the glue, and then make the mineral wool thermal circuit, from the inside the house doing 5cm block and also laid on the glue.

1. 10 inch unit laid on the adhesive .2.Sloy or mineral wool insulation .3. 5 cm block

1. 10 cm block laid on the adhesive.2.Sloy or mineral wool insulation.3. 5 cm block

way
is possible for third place 5 cm block to use the formwork, this is done in order to increase the area of ​​concrete, but it depends on the construction of the wall.

Installing wooden formwork for Laying nets

wooden formwork Laying nets installed very simply.First the formwork made of wooden planks, formwork height of about 30 cm bude enough, then prisverlivaem board to the wall and every 60-70 cm trying to drive additional ties, it is done to the wooden formwork not parted under the influence of the poured concrete mass.

then laid inside the armature 8 to 12 diameter.The most optimal diameter is 12, but if your home is affected by external factors.Next fixtures bandages and laid it on the special stars, thus making an active lower layer.Then flatten the concrete good, thicken and get ready Laying nets.

Valves placed on special sprocket

fittings placed on special sprocket

The next step is to install the pins for fixing the overlap.Studs are installed every 60 cm around the perimeter walls.Studs are needed in order to secure the ceiling and roof, respectively, so that it held steady.

Studs best cellophane wrap , in order not to damage them during the concrete casting

Studs best wrap salafonom in order not to spoil them in the process of pouring concrete

Accordingly, after the pouring of concrete drilled timber and mounted on studs.Incidentally stud can take any length, we took a 1.5 meter rods were cut in half and inserted into Laying nets.

Pouring concrete into the formwork - the last stage

You've probably seen when the concrete is poured from a special sleeve, using a concrete pump.But in some cases, concrete pouring of the concrete pump is not possible due to the fact that the concrete will fall from a great height under pressure resulting in formwork may simply not survive and break down, so you need a good mount formwork or poured concrete with a handlabor.It is best to use concrete grade M200 or higher, by the way how to choose the brand of concrete we have described here.Incidentally concrete can be done independently and, for this nuobhodimo mix cement, sand and schemen in the 1: 3: 5, and thoroughly mix by adding water.

way
pouring concrete should be performed 1 time otherwise may compromise the integrity of the design!

But if pouring concrete failed for 1 time, then do not despair.It is necessary to establish when pouring gazoblok - wooden formwork, which should be a ceiling and the next pouring concrete wet the edge of the water and continue pouring concrete.

3-5 days Laying nets ready for aerated concrete is only set to continue to remove the formwork and construction of the roof.

Video - Laying nets shading the house of gazoblokov

instagram viewer