Drainage of land - the main functions and tasks

Basically the system is settling in order to improve the poor conditions for plant growth because of too high levels of groundwater.That is why this level needs to be adjusted and to provide an obstacle water stagnation.To do this, and you must drainage device at the site.

Excess moisture is formed for various reasons.For example, this may contribute to the clay soil and its high moisture content, the location of the land in the valley, or near any slope too deep foundation arrangement structure and the lack of trees, strengthening the soil and absorbing excess moisture.

This situation is detrimental to the plant, which then reside in the moisture and do not get enough air.Moreover, the ground water may detrimental impact on the foundation, constantly washing away and destroying it.A wet basement is threatening the house the appearance of mold, mildew and loss of heat.Therefore, land drainage is required in all the above cases.

How to arrange the drainage on the site - the types of systems

system unit can be several types of , each of which is characterized by its own peculiarities and recommendations to the arrangement.For example, if there is a sandy or sandy loam soil, it is best to build a linear system.It should be used as a drain pipe.

Pristennye systems are used to protect underground facilities that are under threat of flooding by groundwater.They consist of a reservoir and the drainage pipe.If a building is a powerful aqueous layer, it is best to equip Reservoir Systems.

This embodiment is particularly effective in soils with poor laminate type of moisture permeability.Yet the present system can protect the structure of the capillary moisture.Therefore, before you arrange the drainage on the site, it is necessary to evaluate all the possible options.

Before making drainage on the site, you need to determine the type of soil and learn how to perform the procedure correctly.Usually classical system consists of a waterproof membrane, sand prism and pipes that provide water drainage.Stages of a closer look below.

drainage area - the sequence of work

Before making drainage in the area, definitely need to prepare.For the arrangement of the system will need a shovel, sand, gravel, waterproofing materials, pipes.Further it is necessary to strengthen the waterproofing of the foundation: the house foundations of the soil surface with bitumen, coated with reinforcing mesh, and after drying again primed bitumen mastic.

drainage device at the site with his own hands - it is simple, but you need to carry out the procedure step by step.First slope system provides the necessary (under ground level adjust all differences).Next, on the bottom of the trench dug stacked sand, geotextile, gravel.

The gravel is necessary to make a small groove into which is placed and pipe (perforated).

The pipes need to drill holes to allow water to get inside and displayed.Connection elements made after a final check of the slope.And to be able to flush the system, you need to put some vertical outlets.

Next is winding geotextile tubes, and the system is filled with sand.If there is a need to increase the filter surface, you need to pour a layer of sand gravel layer.About drainage area with his hands videos can be found at the end of the article, so if you need a visual aid on the arrangement, use this opportunity.