Build Daily

Engineering Systems

August 12, 2017 18:07

When the heating will Kurgan in 2015

click fraud protection

As Barrow prepares for the heating season 2015?When

include heating in Kurgan?This question is more than relevant for the residents of the city, as the temperature drops, and the readiness for the heating season of housing is poor.Kurgan prosecutor's office revealed numerous grave violations related to the preparation of urban heating ducts, boilers, as well as housing estates to the heating season.

The apartments residents Barrow colder and heating have not yet

When must give heating in 2015?After all, low willingness housing arrays for the heating period, frequent accidents in the water and heating systems, theft of funds and debts for energy resources - a problem that is becoming more acute with each passing year.In 2015, the prosecutor's office took up the matter seriously, and now all unscrupulous municipal employees get what they deserve.

Barrow graduated in the summer of pipeline repair

social services Objects on September 10, are given in full readiness, housing prepared for winter by 86%.With regard to water supply and heating networks, they are ready by 90%.Repair of boiler-houses completed by 88%.

When Kurgan Heating will first be connected to the heat of the institution of social importance, and then the heat comes in the apartment Kurgan.The exact date of delivery of heating is not named, because it all depends on the daily temperature fluctuations.

In Kurgan waiting for the start of the heating season 2015-2016

From that graph of heat flow depends?

Dates inclusion of heating systems in Kurgan depend on a variety of factors, chief among them:

  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

Mound City administration has allocated in 2015 for the repair and maintenance of heating systems is sufficient funds in time to finish all repairs.

today to start heating 86% of consumers are prepared.Repair and preventive measures are carried out on time.

supply heating Priority Kurgan

Traditionally, the first heat will have social institutions:

  • school;
  • orphanages;
  • kindergartens;
  • hospital.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

room temperature Celsius
optimal permissible
Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

What if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.

instagram viewer