Build Daily

Rooms

August 12, 2017 18:07

Repair of bathroom and toilet - saving , making repairs on their hands

click fraud protection

Stages modern repair

As mentioned above, toilet and bathroom are high humidity and constant vaporization, which forces to use only water resistant material and to carry out all the work carefully and thoroughly.Modern repair in an average apartment should look like this:

  • all water pipes and sewage systems are hidden in the floor or wall or shielded special boxes of plasterboard;
  • walls and floor are tiled;
  • ceiling is perfectly flat - a tension of plastic panels or just soundly Stopper and painted;
  • modern, high-quality sanitary ware;
  • good lighting, both general and separately for the mirror.

repair in the bathroom and the toilet is made up of the following milestones:

  1. Dismantling of old equipment and take-out of furniture and equipment.
  2. Removing the old aqueduct.
  3. Shtroblenie walls for laying new pipes.
  4. Preparing walls and ceiling cladding.
  5. Installing new plumbing.
  6. wiring layout.
  7. laying tiles.
  8. Installation bathtub, sink, toilet.
  9. Installation of furniture and electrical equipment.

Note!Only the repair in this manner can be considered correct and ensuring high quality results.

Repair of bathroom and toilet in the home

consider in detail all the stages of the work.To remove the old equipment the first thing you need to turn off the water supply.Dismantling of the old pipeline, especially steel and iron, may cause some difficulties.In this connection it is necessary to cut the grinder.If the pipes are advanced, plastic, the dismantling will be much easier.

To repair was made a long time and with high quality, it is necessary to use polypropylene tubes with soldered connections.Also, to protect against leaks of their need to hide in the wall vyshtroblennye channels.The water supply with plastic pipes and clamping connection, by contrast, does not give any guarantee against leaks.

line the walls in two ways: by means of cement or plaster moisture-resistant gypsum boards.The second method is simpler and faster.Wiring be sure to lay a single piece and with double insulation, and a junction box must be installed outside the tub and toilet.

Note!Wiring must also be double reserve power.

Repair floor and ceiling

doing bathroom remodeling, room with WC, special attention should be paid to the floor unit, as in the case of flood affected and your neighbors below.In this connection it is necessary to provide good waterproofing for him.The latter can be used as a sufficiently large amount of materials, so that problems with the choice not arise.Sex is best dub by concrete screed.

When laying the tiles need to be monitored closely to ensure that it is not formed under vacuum.Otherwise, the possibility of a split and cover deformation.You should also make the putty seams at full depth.

Important!For laying tiles in the bathroom holding the compositions are used that are not afraid of increased moisture.

for decorative bathroom should choose materials that are not sensitive to increased moisture.Thus, the ceiling can be covered with aluminum profiles or plastic panels.If you allow the financial capabilities, can be used ceilings.The easiest and cheapest way to bring the ceiling in order - it is water-resistant to align its putty and paint.

instagram viewer