Technical specifications on the gas connection

click fraud protection

What is the specification

directly connect the process home to the communications pipeline can be divided into two main parts:

  • Obtaining technical conditions for connection of gas
  • very connection to the gas pipeline system

technical - conditions - to - connect gas - 1
Specifications (gas)determine the maximum load on the connection to the gas housing communications directly connect the planned period.Gas is one of the kind of engineering - communication networks.Special Code defines the rules and procedure of the technical conditions for centralized gas supply of housing, corresponding to which will set the order and duration of connection to the gas supply.

receiving technical conditions for connection

gas on organizations that are engaged in the provision of technical specifications will tell the local administration office, as the process of obtaining a very labor-intensive and prolonged in time, due to the collection of documents and some waiting time.
technical - conditions - to - connect gas - 2

Steps connect housing to the central gas supply network

  1. The first step is to allow for the gasification of housing from the "regional gas companies."What documents are needed: one of the documents confirming the right of ownership;the act of taking into operation;those.passport issued BTI;passport details of the owner (customer) and TIN;application for technical specifications.
  2. second stage - the housing project of gasification, which is being developed taking into account all features of the object.The project must be harmonized heating equipment and gas appliances, as well as their placement.When the project is compiled, it is possible to preliminary calculations, the cost of works.
  3. third stage, directly installation works on the project pipeline and connecting the house to the central gas supply line.Then the representative of the regional gas companies or gorgaza provides technical supervision receipt.
  4. final stage, allowing to obtain specifications for gas, is the conclusion of a contract for the supply of gas and sealing the gas meter, it must be held within three weeks of the filing of the required documents.And one of the mandatory procedures is passage of instruction on safety.This procedure is mandatory, because improper use may suffer serious consequences.

technical - conditions - to - connect gas - 3
If the issue documentation from all the rules, problems in the future with no checks or the operation will not occur.However, when you attempt to circumvent the law and not to the end of issue permits can run into the penalty.