How to make a swing gate with his hands - the drawings , the procedure works and tips

believed that swing gates are the oldest type of gate.Their existence is measured in thousands of years, but the principle of the device remains constant, and the changes apply only to the manufacture of materials and design.

Use them virtually everywhere: in factories, cottages, private homes.The availability of the materials needed for their manufacture, reliability and simplicity of design to explain such a widespread goal of this type.Gates can become an ornament to your site, if you can make them sewing the beautiful.Patching may also be made of corrugated board, wood, sheet metal, forging, etc.

Swing - gate

The advantages of the hinged gate should include:

  • simple design
  • low cost manufacturing
  • versatility
  • long life
  • almost complete absence of necessary maintenance.

However, these gates there are disadvantages:

  • winter to open them, need snow
  • clearance for the gate leaves must be sufficient clearance so that they freely open




Getting manufacturing- milestones

The first thing you need to take care of - it carrying poles.They must be manufactured and then installed.For swing gates can be used pillars of the profile of a metal pipe with a diameter of at least 100 mm of timber, made of solid rock, concrete.By installing these poles, they must be set in concrete to a depth of 1 m or more.

Gate - of - corrugated

If the pillars are built of bricks, their foundations must be concreted at the same depth.Themselves pillars and the foundation should be reinforced.From the pillars inside the opening must be released or placed corner fittings that will be needed for mounting gate pillars.

Concrete for concrete pillars are made on the basis of a mixture of cement, gravel and river sand in the ratio 1: 4.To make it easier to work, rubble best to apply fines.

Bay carrying the post, give it to stand 7 days or more to ensure that the concrete is well grasped.

Pending concrete pour to do manufacturer door leaf.First of all, it is necessary to prepare a frame for pipe manufacturing.They must be cleaned of corrosion and dirt, degrease with a solvent or gasoline and apply a coat of anti-corrosive primer.When pipes are ready to be welded to the frame as a square or rectangle.For two-sided sewing in the middle part of the frame is welded extension tube is flush with the main.Grind the welds, woodwork should be primed and painted.

Gate - drawing

After drying should begin sewing the door leaf.The choice of material and sewing the sewing order - it is very individual and depends mainly on the taste of the owner.

next stage - it suspension gate.If the metal supporting pillars, the Gate hinges are welded to the pole itself.If the pillars of stone or brick, then they must be attached using dowels metal rack.And by this rack fastened by welding loops.

If you do swing gates with their hands, they will manage to you much more cheaply.If you know how to do basic metalwork operations and if all required materials are on hand, the production of swing gates will take two or three days.