Build Daily

Instruments

August 12, 2017 18:08

The procedure for the lubrication and assembly perforator Bosch 2-26

click fraud protection

Content

  • 1 How to extend the performance of the gun Bosch
  • 2 Assembling the gun Bosch 2-26
  • 3 Assembling electrical perforator Bosch 2-26
    • 3.1 rotor assembly Hammers Bosch 2-26
    • 3.2 Installation stator housing
    • 3.3 installation control units puncher
  • 4 Assembling mechanical perforator Bosch 2-26
    • 4.1 Assembling the countershaft
    • 4.2 node assemblyimpact barrel
    • 4.3 Assembling the mechanical assembly and rotor
    • 4.4 Set the mode dial knob
    • 4.5 quick assembly of the cartridge
    • 4.6 Video repair faults perforator Bosch.

For long work perforator Bosch necessary any regular and timely maintenance, the use of quality lubricants, timely replacement of carbon brushes, rubber products.Condition monitoring of bearings and wear.Getting repairs perforator Bosch with his hands, it is recommended to apply the lubricant, which advises the manufacturer.

How to extend the performance of the gun Bosch

Hammers Bosch require mandatory inspection and maintenance.To properly operate the drills, it is necessary to:

  • to prevent dust from entering the cooling holes (you can wear a nylon stocking or use a vacuum cleaner);
  • lubricate the shank drills with special grease;
  • not overheat power (when overheated lubricant crystallizes and stops lubricate moving parts);
  • intensive work to replace the rear rotor bearing every 6 months;
    through 70 hours to change the carbon brush;
  • for drilling holes in the ceiling to turn the hammer down and scroll in such a position for the flow of lubricant to the place;
  • after work is required to purge the inside of the gun with compressed air;
  • often change the rubber sleeve on the chuck punch;
  • avoid the appearance of sparking brushes on the collector in an idle mode;
  • duration of continuous operation should not exceed the 30-minute interval;
  • not use the "Blow" mode often.

Being accepted for the repair of the gun Bosch 2-20, 2-24, 2-26, see the map indicating the lubrication points grease and lubricants.

Hammers Bosch Lubrication

Lubrication perforator Bosch

Bosch rotary hammers for lubrication used several types of lubricants, depending on the operating conditions for units and parts.

  • 1615430001- lubrication for gearbox and its cavity;:

    four types of lubricants used in the Bosch rotary hammers

  • 1615430002- lubricant for gears, idler bearings, clutch;
  • lubrication 1615430020 - bearing (FT1V26);
  • grease SAE 20 W - for rubber products.

Lubricants vary in viscosity and consistency.

From Russian lubricants may be recommended lubrication under sonorous name "BisonĀ»:

Patriotic Boer grease for Hammers Bosch

Patriotic grease shank drills for rotary hammers Bosch

The rotary hammers Boschprimeneny 8 bearing three poz.13,14,67 rolling bearing, bearingpendulum (drunk bearing) and four needle poz.60,61,62,63.

Hammer Bosch 2-26 in section

scheme of the Bosch hammer drill 2-26 sectional

Assembling the gun Bosch 2-26

assembly punch is recommended to perform under the scheme, such as the Bosch rotary hammer 2-26.The presence of the assembly scheme simplifies the process, tells the sequence of assembly of parts and components.

Assembling other rotary hammers Bosch is the same, although some design features in rotary hammers Bosch 2-20, 2-24, 2-26 are available.

Assembling electrical perforator Bosch 2-26

assembly power tools, including hammer drill Bosch 2-26, should be performed on a pre-prepared site.
Prepare workplace, lay a table or a clean paper towel.Prepare the tools required for the job.Of the tools you will need: a screwdriver, pliers, tester, the hammer 100 g, spacers of soft metal.Spacers come in handy when installing bearings on the rotor shaft and the intermediate perforator Bosch, for their heads.

Driving electrical perforator Bosch 2-26

scheme electrical perforator Bosch 2-26

rotor assembly perforator Bosch 2-26

on refurbished or new rotor poz.803 set pos.5 fan and bearings poz.13,14.For lubrication of the rotor bearings use grease from Bosch 1615430020.

Installation stator housing

stator installation pos.2 in poz.801 body begin to threading through the body connecting wires of the stator coils.The stator in the housing is mounted with two screws poz.80.To protect the stator from dust or dirt, it is installed in the housing plastic casing poz.45.

installation control units puncher

The body poz.801 consistently set the on punch button Bosch, contacts and charge poz.19 pos.16 reverse switch.Make sure that all lead wires fall into the grooves in the handle of the gun.

Assembling mechanical perforator Bosch 2-26

Before assembling mechanical parts, check for new rubber sealing ring, the integrity of all components, the presence of lubricants according to the lubrication map above.

The circuit assembly of the mechanical block units

Driving mechanical assembly unit nodes

Assembling the countershaft

intermediate shaft assembly poz.826 begin with the installation of the bearing shaft poz.67, clutches and clutch poz.62 drunken bearing poz.830.

the shaft sleeve worn gear poz.823, needle bearing poz.63, compression spring poz.81, retaining sleeve poz.65.

intermediate shaft assembly is installed in the inner housing poz.820 and fixed clamping bracket poz.48.

The intermediate shaft assembly

intermediate shaft assembly

Assembling shock barrel assembly

subassembly impact mechanism starts with the installation on the barrel shaft poz.821 spur gears poz.22, conical spring poz.80, retaining rings pos.85 and the steel ring poz.38.

Instruments
Widget from SocialMart

poz.22 installed pinion shaft fixed to the barrel roll poz.88, not allowing the pinion to rotate on it.

On the opposite side is inserted into the shaft cavity drummer poz.847 assembly and the piston stroke poz.26 assembly.

The hammer , the hammer , the cylinder

scheme and order of assembly punch Bocsh

striker assembly begins with the installation of rubber sealing rings pos.74.75, scraper poz.71.Assembled hammer tightly inserted into the cavity of the table.

shock piston assembly begins with the installation of two washers poz.41.To washers held in a groove of the piston, grease lubrication grooves surface.It remains to establish the piston pin poz.29.The inner cavity of the piston hammer peen set and the entire structure poz.27 insert into the cavity of the barrel impactor.

impact mechanism unit is assembled.

barrel assembly Bosch 2-26

Assembly Diagram barrel percussion perforator mechanism Bosch

impactor shaft and intermediate shaft set in the inner poz.820 housing.

assembly mechanical assembly and rotor

To Collect mechanically node joins the rotor.The gears of the rotor assembly and the firing mechanism firmly into each other.To install the rotor in a mechanical punch assembly, it is necessary to insert the helical gear rotor in the inner casing into contact with the helical large gear intermediate shaft.After assembly, turn the rotor by checking the smoothness of scrolling.

A compound of the rotor bore and stroke mechanism

compound of the rotor and the impact of the barrel mechanism

Assembled mechanical unit closed black plastic cover poz.819.The lid is secured with four screws poz.90, with the installation of the sealing rubber ring poz.77.Rubber O-ring prior to installation is required to lubricate the grease SAE 20 W.

remains to connect the stator housing (green) with a mechanical block body (black).Corps joined with four screws.

At the last stage set carbon brushes in the brush holders poz.811 pos.16 reverse switch.The handle is embedded pos.4 speed control button.

a button connected the wires from the stator windings poz.101, 102, power cable poz.806.

Crank shaft impact mechanism (first manually and then energized), and make sure the rotor rotates smoothly and brushes do not prevent it from moving uniformly referring lamella collector.Sparks near the brushes do not have a tail, and sparked evenly over the entire working width of the part.

remains to close the cover with two screws poz.41 poz.77.

Set the mode selector knob

To set the mode selector knob poz.832 need to hammer Bosch 2-26 put to one side.

Set the mode switch

Installation

collected mode selector knob poz.832 mode dial is set to the gun body so that the red pen button was directed parallel to the handle of the gun.

handle is rotated in a clockwise direction to the position of "drilling".There will be a click.The handle is inserted into the gun.

sure to check the operation mode switch, turning it to the desired position and including a punch in each mode.

quick assembly of the cartridge

The Bosch rotary hammers used chuck SDS-plus models.

they are structurally different device working bodies of the clip.

assembly punch cartridges produce renovated cartridge replacement destroyed part.

cartridge assembly before it is mandatory to check the locking balls.They must be corrosion, and their diameter must not vary by more than the nominal 0.01 mm.

quick chuck assembly sequence repeatedly described on our website.

The build quality of the quick chuck is determined by its capacity for work.Insert the cartridge in the gun of any tool with a corresponding shank.Hold the hand on the body of the drill, try to get him out of the weight of the cartridge.If you do not manage to do, the job holder is considered to be reliable.

That's all.Hammer Bosch 2-26 assembled.Build models of drills Bosch 2-20, 2-24 is almost the same except for small details that do not affect the assembly process.

Video repair faults perforator Bosch.