Frame 6x6 room on the site

click fraud protection

We design bath 6x6 with loft: planning

1

The first thing to be taken care before the start of works and procurement of materials - the drafting of the future building.Ideally, this is followed to refer to specialists as professionals to quickly make a project that will have a number of advantages over a homemade:

  • long service life is ensured by qualified baths calculation load on the frame;
  • the correct selection of materials, depending on their weight and performance properties;
  • professional cost estimates (avoid overspending of the material, but also do not have to re-buy);
  • hassle bathhouse in the cadastral registration documents;
  • price increase home / garden with a bath in the sale.

Order professional documentation can be in the offices and companies are engaged in a frame building, or buying ready-made set of materials to the desired size bath.In the latter case, you will be immediately everything you need for the start of assembly.

Note!It is not necessary to choose only from the finished projects available in specific offices.Specialists can make baths project 6 6 with a mansard or without taking into account all your requirements.Deviations from the standard plan, of course, affect the price of the project, but the result will please you for many years.

In principle, the project - it just sounds so formal, but in fact you can just plan the room so that the construction process is not a desire to change everything, to replace already bought other stuff.An important point in the frame construction - correctly calculate the load on the supporting structure.If you get it done, and with other aspects of the design you can do it for sure.

If you decide to independent calculations, keep in mind that:

  • load on the ground of a small bath, so do weakly deepened foundation tape;
  • framework for baths with a quick way to mount in standard projects going in increments of 95-100 centimeters;
  • basic material for the assembly - the board or 15H5 bar 10x10 or 10x5 cm;

Note!With self-selecting wood for building carefully check its humidity.Wood with a moisture content greater than 20% is very likely to lead in the operation, and the deformation can be so strong that they require complete replacement of the material.

  • bath 6x6 layout with a loft should consider the placement of the pair, washing compartments, locker and changing room on the first floor;
  • size washing and paired branches come from the expected number of tourists;
  • washing, steam room and changing room are separated by partitions from the main carcass material bath + insulation and vapor barrier;
  • safety requirements involve placing the furnace-heater is not in the steam room or washing, and in the dressing room;
  • access to the attic is from the waiting room;
  • if desired, can be placed in the attic terrace or veranda.

bath How to build a framework 6x6 m with an attic with his own hands

The easiest way to do this if you have purchased a ready-made "designer".In this case, each element has picked up and vymeryat professionals, but to the whole kit supplied very precise step by step instructions.

If the building from the beginning to the end is supposed to perform with his own hands, after the completion of the project and the choice of the construction of the place, you can begin to prepare all necessary materials.

2

You will need:

  • Edged board 50h120;
  • square timber 120x120 standard;
  • Unedged board and board for crates;
  • timber 40h75;
  • wall paneling, siding or other light finishing material for the walls;
  • mortar;
  • roofing material;
  • OSB;
  • roofing material;
  • mineral wool;
  • expanded clay;
  • fasteners.

Consider stepwise assembly process of framing baths 6x6 meters:

Step 1: Prepare site.The isolated ground leveled, mark under construction.

3

Step 2. On the perimeter marking set the foundation belt type.Keep in mind that it should take place both under the exterior walls and under the load-bearing walls.

Step 3. From the beams, rafters and translations mounted frame (four frames).The frames are attached to the piping in the ground over the waterproofing layer.

4 5

Note!At this stage it is important to soak all the wooden components of anti-fungal and anti-parasitic compounds, and metal parts from corrosion process.

Step 4. processed and half wet harness fastened with anchor bolts wall components.

Step 5. Mounting foam need proizolirovat all joints occur in order to avoid blowing the building.

Step 6. On the frame is erected and rafter system crate.

Step 7. crate mounted boards (eg OSB), which is laid insulation.

Step 8. rafters fastened roof.

6

Step 9. Install all interior partitions.

Step 10. The partition near the furnace should be thermally stable to impose bricks.

7

Step 11. Finishing: laid in the walls mineral wool, steam, and they sutured lining;the floor is poured concrete block and fits vapor barrier, after which the floor is also sewn planks.

Step 12. If necessary, execute external finishing bath siding or clapboard.