After a full sinking the borehole to the required depth of clean water immediately not go by the definition.Explanations for this are several.First, even if the aquifer and contains no solids, the slurry is initially in tiny water will be present.Secondly, during the drilling of the rock is somehow partially crumble down, and completely remove it (eg, bailer) will not work.

That is why, after the completion of the arrangement it is necessary to pump the well, or as they say professionals shake.How to do it, the essence of technique - with all the nuances can be found in the proposed article.

What you should know about pumping wells

Even right has circulated well, you do not get a full guarantee that do not have to deal with in its further purification.But the life of the barrel until the next service when the competent organization of the buildup is increased many times over.

duration of the cleaning process depends on the soil characteristics and depth of the barrel, so specific recommendations on the time of the meeting there.Experience shows that with equal probability to the buildup may need and day, and a few weeks.

Note!Owners of plots alumina advisable to consult specialists.After drilling, even after quality "rough" hole cleaning, self-swinging very difficult to do.The reason - in the formation of mud that remove extremely difficult.This will require powerful equipment and large volumes of water (in some cases - up to 1000 m³).Where to take it in such numbers?It makes no sense to explain, and what kind of time and effort associated such work.

Technology buildup

process itself is not anything complex - submersion into the barrel and banal pumping water.




pumping wells ,

What to consider when buildup:

  • Full lightening fluid is not an indication that the work is done completely.It is necessary to wait at least 15 - 20 minutes, without turning off the pump.Only if all the time goes really clean water, the buildup process can be considered complete.
  • optimum device location on the bottom level of the filter - about half a meter.This ensures that the layer formed from the solid fractions which are "clipped" and filter precipitate, will cover not him or the pump itself.

Driving - pumping wells ,

Common Mistakes

no organized discharge of fluid from the trunk. a result, it again starts penetrating into the well.Not only that destroyed its walls, but also the time on leveling process increases many times (if not forever).

When lowering the pump into the pit it has not fastened the safety rope. If the product is in operation will naperekos, then pull it to the surface will be difficult (if not impossible, without additional measures).Use of a cord, which is included in the pump, it is inappropriate, as it can not withstand excessive dynamic loads and simply terminates.That is why you must use only a flexible metal cable.

Driving - clean - well Wrong choice of pump status. too close to the bottom - is often clogged with mud;directly at the water's edge (Mirror) - low efficiency, because the solid fraction it will capture only partially, basically the same will drive top water.Result - cleaning the well will be delayed for a long time, and the quality of the liquid will remain low.

use "working" pump (designed to be installed in the well) during the buildup.The purchased product for these purposes are not suitable for long-term operation in extreme conditions.They are good clean fluid is pumped, but if they have suspended solids, and in large quantities, the product or relatively fast break, or after formulation into the prepared hole "in the hospital" did not last long.

is therefore advisable to buy cheap immersion model for swing (for example - an inexpensive pump type kid).At least one, even this deep well pump will suffice, and if it is then it will be unfit for further use, the loss is relatively small.Well, if he survived, it is always useful as a spare (emergency) option.

Recommendation.Since the load on the product during pumping "dregs" will be increased, it is necessary to acquire a centrifugal model.Good downhole pump is between 25 and 000, and to pump enough product for 7500 - 9000.

Continuous buildup. In this mode, no single model will not sustain for a long time.The appliance must be periodically stopped, pulled out of the barrel and efficiently cleaned.

information is more than enough to properly organize the process of self-pumping wells, especially as tips for all occasions can not be given.Good luck!