Build Daily

Decoration Of Premises, Renovation Of Apartments

August 12, 2017 18:07

The box is made ​​of plasterboard with their hands

Mounting boxes made of plasterboard - excellent design solution, which are increasingly being used to improve the design.This element helps hide irregularities of the walls and the ceiling, thanks to the possibility of embedding lighting, harmoniously and elegantly fits into the overall atmosphere of the room.Next, we consider the question of how to make a box of drywall.

Content

  • Advantages and device boxes of plasterboard
  • Choice drywall for
  • box device Recommendations for installation boxes of plasterboard
  • How to make a box of drywall on
  • ceiling Recommendations on manufacturing boxes in the bathroom of thedrywall
  • Tips on making boxes of plasterboard with their hands
  • Installation boxes illuminated plasterboard

Advantages and device boxes of plasterboard

box drywall is a structure made of aluminum profile, covered with plasterboard.Such structures mounted on the ceiling or on the wall, for better concealment of water or air communications.The box of drywall often inserted into a variety of lighting fixtures, which perform additional lighting function.10

The box on the ceiling like a multi-level ceiling.The only difference is that the design of the box does not apply to the main ceiling.The box is set on the ceiling or on the whole perimeter, either in the form of geometric shapes.The device boxes of plasterboard on the ceiling will be cheaper than the installation of multi-level ceiling.

benefits of installing boxes of plasterboard:

  • hides defects ceiling,
  • ability to hide the wiring and communication pipes,
  • installation of lighting helps the device general lighting and gives the room elegance,
  • can adjust the lighting and zoning room,
  • a variety of shapes and forms ducts make the room unique.

Box plasterboard Photo:

I

Selection boxes for plasterboard device

Plasterboard is used for decoration and consists of gypsum and a protective layer of paper.Paper Drywall helps to be more flexible and protects the stone from humidity and mechanical damage.

From box installation location depends on the form of plasterboard used in the installation box.

drywall Species:

  • URK - standard gypsum board, used for walls, ceilings or partitions for forming such gypsum board is suitable for rooms with low and medium levels of humidity;
  • DURK - plasterboard with a protective layer of water-resistant impregnation and preservative, such drywall is resistant to mold, mildew and moisture, used in the decoration of bathrooms or rooms with high humidity;
  • GKlo - the inner part of the drywall is not only made of plaster, but also glass fiber supplements and mineral mixes that make the material flame retardant.

8

Installation Recommendations boxes of plasterboard

1. The box of drywall is installed on the prepared surface.To do this, it is necessary to hold a series of preparatory works, which include zashtukaturivanie and luting surface.

2. The aluminum profile should be purchased only in specialized shops.Keep an eye on the profile quality.

3. Do not use a cheap profile, as the design will not sustain the load and deforms during use.

4. Before installing drywall should complete the preparatory work related to electricity.

5. The sheets of drywall should be fixed at a prearranged frame.

How to make a box of drywall on the ceiling

1. Apply marking with a pencil and level.Raschertite on the ceiling and near the wall of the box structure.When applying a markup note length aluminum profiles and sheets of drywall.

2. Set the frame profile.In accordance with the marking lines cut and fasten the structure of the profile.For these purposes, use the hammer.For the convenience of fixing raschertite box outline on the floor, and then move to the ceiling.Attach the aluminum profile with screws and wall plugs.Be sure to check the evenness of the installation profile design.

3. Install hangers.Cut with scissors hangers, metal, according to the size of the box.Secure the hangers to the structure of the guide profiles.The guide should be flush with the entire design.

4. Install wiring for fixtures.Make the layout and fix the wires.

7

5. Fix the cross-type guides, pre-cutting them.The minimum interval between the rails 1 m. Securing the guide wire with the help of screws and screwdriver.

6. Cut out the necessary details of the drywall.Please fasten drywall to the bottom of the structure, and then to everyone else.Make holes for the fixtures.

7. Secure the structure by means of screws.

After installing plasterboard boxes should conduct finishing work.spackling surface - very important process finishes, which will determine the appearance of the box.

Tools for work:

  • spatula 5 cm,
  • spatula 20 cm,
  • perforated masking area,
  • large and small mesh.

Using two spatulas to apply the surface layer of putty box.A small spatula helps to apply plaster and large - distribute the mixture over the surface.

Gently press down the spatula to the surface of the drywall and remove excess putty mixture.In order to form smooth corners, use a paint area.Fixing bracket made by applying putty on the edge.

initial process is performed starting spackling putty and finishing - finishing.Choose the plaster from the same manufacturer, to avoid delamination of putty.

After drying putty should be aligned first major surface, and then a fine mesh.To become perfectly flat surface using a special lotion.

paint the box in the desired color and Mount the lights as required.

6

Recommendations on manufacturing boxes in the bathroom plasterboard

Box Drywall installed in the bathroom in order to hide pipes or other communications.

To produce boxes need aluminum profile and moisture resistant drywall.

consider the option of manufacturing plasterboard boxes, which hides the pipe extending into the corner of the bathroom.Installation box

begins with the formation of the carcass, which is composed of the three axes, made of aluminum profile.

This box resembles the structure in the form of a right triangle with a completely smooth sides.

1. First, you must make markup and measure the side boxes.

2. Two-axis, close to the wall must be secured with dowels and screws, and the central axis is attached to the side walls or to the other two axes.

3. Once the frame is ready to be checked for evenness design by layer.

4. Measure the verge of the box and cut the bars of the drywall.

5. Attach the parts with screws to the frame.

5

6. Such an installation box for hiding both horizontal and vertical pipes.

Tip: If a pipe or other communications in the bathroom is not touching the wall, use the four-sided plasterboard lining, which is made in a similar way.Allow the device box hatch, which will provide quick access to communications.

Tips on making boxes of plasterboard with their hands

  • installation box in the bathroom is made in such a way that the element is not a hindrance in access to communications;
  • screws are fixed closer to the edge of the wall to make it easier to install the tiles;
  • not cover screws tiles, leave a small gap, which set the plinth, this method will help you easily make out the design;
  • leave a few centimeters at the bottom of the box is not closed, in order to spot leaking water;
  • to make the box more durable, install ceramic tile, which will not burden the construction of the box;
  • to install tiles using adhesive for finishing drywall.

4

Installation boxes illuminated plasterboard

to work, you must have:

  • CD, UD profiles;
  • dowels and screws;
  • screws with brown pometallu;
  • screws L 25;
  • drywall;
  • grid for joints;
  • primer;
  • perforated corner;
  • putty;
  • vodoimulsionnoy paint.

1

Start with the installation of aluminum UD profile.This profile will shape the future design.

This step allows you to adjust the structure.Set the following sections, keeping a distance of 0.4 or 0.6 m. The interval between the profiles depends on the load on the box.For large size construction, reduce the interval, while small - increase.

Install wiring, Bring wire in lamps location, check that the electrical wires.Install corrugated sleeve, which will be electric.

Remove measurements with profile frame.Cut gypsum blanks and attach them to the box.The distance between the attachment locations of about 14 cm.

3

After completing box plating hide wiring, to proceed with the finishing work.

When shpaklevanii boxes, first set perforated corners with a stapler or fillings.When shpaklevanii use the grid, which will not allow the cracking of the structure.

After all joints and seams sealed proceed to finish the whole box.

After complete drying of the last layer of putty abrade the surface with a fine mesh.

Prime with the surface with the help of deep penetration of the soil.

2

After 24 hours, when the primer is dry, begin to stain the surface of the water-based paint.Apply the paint in two or three layers.With a brush paint the corners and hard to reach areas, use a roller for painting flat surfaces.

When the paint is completely dry, use a mounting a knife or drill with a special nozzle cut holes for light fixtures and install lighting.

instagram viewer