Build Daily

Engineering Systems

August 12, 2017 18:07

When the heating will Nizhnevartovsk in 2015

click fraud protection

As Nizhnevartovsk prepares for the heating season 2015?

absolutely all social facilities and housing should be prepared for winter, when heating include in Nizhnevartovsk.While preparing for the integration of heating goes according to plan.The percentage of the city's preparation for the heating supply is more than 95%.

In Nizhnevartovsk replacement of more than 10 kilometers of utility networks

To date, completed work on the replacement of obsolete utility networks, heat supply to the fully prepared 20 boiler houses from 22 to heat networks is almost complete repair.In apartment buildings made crimping more than 85% of the network.This year a lot of control quickly cope with the tasks, faster than last year.

When Nizhnevartovsk give heating, all boilers should be ready for the heating season.Today show full readiness CHP-3 and CHP-2.Particular attention is paid to the preparation of district heating systems, water supply and sanitation.

Residents Nizhnevartovsk waiting for the start of the heating season

When must give heating in 2015, the first to get his objects of social significance, and later will come the heat and into homes.The exact date is unknown, and the inclusion of heating in connection with the residents expressed concern.After all, over the past few days the temperature dropped significantly.

From that graph of heat flow depends?

Dates inclusion of heating systems in Nizhnevartovsk depend on a variety of factors, chief among them:

  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

Nizhnevartovsk city administration has allocated in 2015 for the repair and maintenance of heating systems more than 61 million rubles.

today to start heating 95% of consumers are prepared.Repair and preventive measures are carried out on time.

In Nizhnevartovsk passes inspection of heating equipment

supply heating Priority Nizhnevartovsk

Traditionally, the first heat will have social institutions:

  • school;
  • kindergartens;
  • orphanage;
  • hospital.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

room temperature Celsius
optimal permissible
Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

What if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.

instagram viewer