The foundation of asbestos-cement pipes : the basics of construction

click fraud protection

Benefits foundation

12 -base- of - asbestos pipe - 1

most suitable for building the foundation of a small square footage of the asbestos-cement pipe , on which there will be a lot of pressure the upper floors and the like.It differs economically and profitably in contrast to other types of foundations.Install on any ground, solid and heaving soils.Installation is made on the principle of the pillars (tubes), and wood "chairs" placed at a certain distance from each other.The foundation has a major advantage over the other - it is anti-corrosion properties of metal.And asbestos cement pipe is cheaper than other foundation.

The benefits of asbestos-cement pipes include:

  1. not subject to corrosion and rot.
  2. cheapness.
  3. Easy to install and work with them (cut with a hacksaw or a saw).
  4. resistance all sorts of environmental effects.

All mentioned makes these pipes most popular for the construction of small buildings.

pier foundation of asbestos-cement pipes: features

12 -base- of - asbestos pipe - 2

foundation set, when at a depth of 2-3 place solid ground.If they are deeper than the specified footage, then use the tape.

To make it more clear in the photo below, pier foundation.

Presented in the form of support from the asbestos cement pipes with a diameter of 200 mm, bricks, concrete, rubble concrete, etc.

Each pillar is set on a corner section of the walls, and at the junction of the internal and external walls.Between the pillars should be a distance not exceeding the length of the log.Therefore, if the house is built of wood, this is followed closely.This distance is called Zabirko.He was not laid with bricks and concrete, so that in case of swelling, they have not violated the foundation of the state of the entire structure.

foundation Calculation of asbestos-cement pipes

12 -base- of - asbestos pipe - 3

Procedure:

  1. Counting the number of poles.
  2. Exploration of soil characteristics in the construction and availability of groundwater in its territory.
  3. awareness about the extent of soil freezing in winter.
  4. Counting building size and approximate weight.

Global payment pier foundation depth is conducted on what materials will be used.

Pillars should be an amount that it can evenly distribute the weight of the building around the perimeter.Above ground poles speaking mainly to half a meter, but if there is a threat of flooding areas, their height increases to how significant water content.Information about this can be found from the people of the area.

Preparation

12 -base- of - asbestos pipe 4

If you choose asbestos cement pipes for the foundation, then you need to take care of the construction site.Determine the site for construction of more than 3 meters of the building layout.

The whole area is cleaned of debris, shrubs, trees and topsoil removed by 20 cm and placed in the garden or vegetable garden of the plot.

When preparation is made, make a foundation layout according to the architectural project.For clarity in the corners hammered pegs and pull a cord or rope between them.

Pipe installation

12 -base- of - asbestos pipe - 5

pile foundation of asbestos piping installation involves the use of a drilling machine or a drill garden.The well is drilled to the required size specified in advance.

poured sand into the wellbore to 20-30 cm. And it put asbestos pipe.

  1. Krepjat pipe spacers, so it was exactly.To be safe, you can even insert into the middle of the fitting.It can also fix that when asbestos pipe will be filled with concrete, rebar is not shifted.
  2. reinforcement must extend to a distance of half a meter, so that after became the basis for the fundamental beam or timber.
  3. Concrete harvested at the factory or are prepared on-site by yourself.Then poured into the pipe.And 28 days of the concrete should be immovable, that is completely harden and become 100% durable.But for one reason, that in itself asbestos pipe firm, the following list of works to the structure can be performed in 2 weeks.
  4. Once the concrete pillars will be completely solid, their line the upper part to the same level, with the use builder's level.
  5. After alignment begin to build piping and reinforced concrete beams, depending on the main material of the walls.It can be used as a factory and handmade foundation of reinforced concrete beams.

foundation is set, and you can lay the first brick of a new home!