Build Daily

Building

August 12, 2017 18:06

Do waterproofing strip foundation with his own hands - the methods and tips

click fraud protection

basement waterproofing is carried out for all buildings, regardless of its size and design.Such activities protect the base of the structure from moisture and basements - from flooding.In any soil in a given amount of water is contained, and often it occurs in solid layers.In different areas of the different layers of the depth.At the same time, and the height to which the groundwater rise, is also different, so, you know, just can not be foreseen.Therefore Blog Top House strongly recommends how to take care of a waterproofing.

Strip foundation, you can isolate yourself without resorting to the services of specialized organizations.However, before proceeding with such work, be familiar with its technology.It should be noted that the waterproofing must be continuous without any breaks.The quality of the applied insulating material, and should provide protection from the corrosive environment, as in areas of different chemical composition of groundwater has its own characteristics.Waterproofing strip foundation is made by several methods.




hydro - tape - basement - 1

coating on the surface of the foundation layer is applied to the special postmark.This method of sealing is the most inexpensive and does not require much effort, but it is often overlooked one important point.When the foundation is covered with earth (and this gravel and pebbles, debris), then a layer of mastic will be partially damaged.To prevent this, a layer of mastic to be protected.Different materials (eg geotextiles), or elevated brick wall (close to the foundation) are used for this purpose.So it is not very easy and simple, but reliable.However, before applying the mastic foundation must be thoroughly cleaned and dried, and it also takes time.

Application roll materials

Most often, this roofing material.On the cleaned surface of the foundation smeared liquid asphalt, and once glued strips of roofing material.Stacked them with some overlap.In practice, the stacking is carried out in two layers - the first for the second coated with bitumen, and then applied a second.

Spray

This method is more expensive, but it does not require a lot of time and careful preparation of the surface of the foundation.It is enough to clean it from dirt and debris.With sprayer (similar to the gun) is applied on the foundation insulating composition.Its layer (thickness) recommended to the manufacturer's instructions.However, such isolation for safety must be the top covered with material from the same geotextile.

hydro - tape - basement - 6

penetrating insulation

very expensive and time consuming method.Used special formulations that have a "penetrating" power.Its surface becomes resistant to moisture.Typically such agents in the composition include silica sand, cement, special substances - additives.

should be remembered that the waterproofing strip foundation is both horizontal and vertical.The horizontal joints is applied at the foundation wall and vertical - on the surface of the foundation slabs themselves.It can be of three types.It depends on the water at this location acts on the foundation.The decision on the application of methods and materials adopted for each individual structure.

Video interview specialist for waterproofing - very informative:

instagram viewer