Build Daily

Home Construction

August 12, 2017 18:05

Steam from a bar with your hands

click fraud protection

Own bath from a bar - it is not only physical health, it is also a great occasion to meet and chat with friends.Steam helps to cleanse the body much more efficiently than a bath or shower.At the same time the body gets a huge energy boost.Steam from a bar with your hands - an achievable goal for most homeowners.Its construction was simple if you follow the step by step instructions with photos below.

Content

  1. Foundation
  2. Roof
  3. Sewerage
  4. Interior work
  5. Videos Construction bath from a bar with your hands

Foundation

One of the most expensive items of expenditure underany construction is the construction of the foundation.To reduce the cost of the project cost and simplify construction, pier foundation was made.It is a concrete block, which are installed in areas of high load (for future walls, the stove, the angles of the building ...).For reliability poles should sink into the ground to a depth of 70 cm (ideal depth will be the depth of soil freezing).

optimal size of a bath timber 3x5 meters. Bruce is recommended as the material available and easy for installation.Dimensions baths are optimized for timber sizes are available (according to the standard price).Power is better to choose the size 90h60h30 see need 8 pieces.The blocks are set in recesses dug and leveled by one level.From above they should lay a waterproofing (roofing material) and directly on them the whole structure will be mounted.

Phased construction of a bath from a bar requires a construction scheme (ideally make complete drawings).This is necessary for the accurate calculation of materials and the establishment of temporary construction framework.

To build the bath takes approximately 5 m3 of timber with the parameters of 150x150 mm.Bruce should buy from a trusted supplier.Bath of timber 150x150 mm is realized on the basis of the finger joints.To simplify the connection bar therein drilled holes which then recessed wooden pins (you can use metal, but will decrease the durability of the bath).Full cycle of works is able to perform the same person.The gaps between the bars is recommended to score a tow (it is convenient to lay on top of the bar to the next sheet).Construction bath from a bar at the stage of laying the framework is quite simple.During the construction of the roof, require additional hands.

Roof

most budget option for the bath of the roof is a gable roof, covered with slate.

to the rafters and trusses need timber 120h50 mm.It is necessary to make six farms for laying slate in a row (first ramp) and a half of the series (second ramp).

Sewerage

Sewer pipe is displayed in a septic tank, dug nearby.To create a septic tank, you can use old tires.

Interior work

to create steam to be used in compact oven 12B, which has a built-in water tank.Foundation for the furnace, it is desirable to make a cast (it has a lot of weight), you can also use blocks.From the brick wall is laid out around a furnace door.

between the sink and the waiting room is made of concrete blocks jumper.In cleaning the floor was made as follows: a thin layer of expanded clay concrete screed was laid, then a layer of expanded clay about 20 cm, from top to tie with a bias to the pipe.The integrated floor drain to drain the water, so you should perform a floor drain with a hole lattice.On top of stacked larch planks.

In a waiting room on the leveled ground at ground level is laid out roofing felt.In his old sleepers installed on top again roofing material and larch planks.

This plan how to make bath from a bar will provide two bath rooms (anteroom and washing), which will not be afraid of the frost (you can bathe in the winter) and with an affordable price.

for exhaust gases from the furnace uses stainless steel tube (three parts to 1 meter).On top of it set the visor.

walls in the steam room should be insulated Penotermom 3 mm (glued seams aluminum tape).This insulation will trap heat and will not affect the timber moist air.Inside washing followed sheathing wooden paneling.

dressing room insulated Ursoy 50 mm, is placed on top of it, steam, and then sheathed clapboard.

After finishing floor space decreased slightly.Dimensions wash up 2h2,65h2,10 m changing room 2h2,5h1,95 m vestibule 1,8h0,6h1,95 m. In the vestibule, which is located a bundle of firewood for half of the furnace.

pipe through the ceiling is as follows: the top sheet of galvanized nailed on the edges of a square aperture, the bottom sheet of asbestos and closed all single sheet galvanizing.The attic wearing sleeve tube, about 40 cm in diameter and it poured concrete block height of 60 cm., So the transition is in a sandwich Leca.A major part of the sandwich over the roof.The ceiling is covered with a layer of expanded clay 15 cm.

In order to get a better understanding of how to build a sauna from a bar with your hands, you should carefully review the photo report of construction.

Videos Construction bath from a bar with your hands

instagram viewer