Using shingles allows to give any structure stylish and modern look.Carry out work on their own can be: difficulties in laying the insulation layers of roofing material does not arise.The complexity and duration of the work depends on the shape of the roof, its size and design.

Content

  1. scheme roof unit from the soft roof
  2. How to start installation shingles?
  3. Warming soft roof
  4. Harvesting plenum and shingles installation
  5. Completion
  6. Video soft roof with his hands

scheme roof unit from the soft roof

CHow to start installation shingles?

for laying shingles with their hands need to create a solid foundation - Truss.It is made of timber with dimensions of 150x50 mm.The distance between neighboring rafters is about 60 cm. The layout determines the future structure of the roof.But regardless of the size or angle of slope of a soft roof installation will run without any problems.After the construction of roof system or prior to assembly design it is recommended that treatment with antiseptic lumber.

next stage - the vapor barrier of the roof.Installation of the layer made from the garret (attic) room.Securing the web material begins from the ridge, parallel to the eaves.

By truss construction layer attached staple gun.Each new layer is applied to the previous overlap of 10-15 cm. Grips foil joints with duct tape.

Warming soft roof

laying mineral wool insulation is carried out from the outside.The first layer of insulation sheets will be located between the rafter (perpendicular to the eaves).Before laying them need to perform the dirty lining from the attic.The optimum thickness of the insulation layer for the central region of Russia is about 15-20 cm (2 insulation sheet).

Further installation is carried kontrbrusa 50x50 mm in increments of 60 cm. It is placed parallel to the second ledge layer of insulation (sufficient thickness of 5 cm).

This two-tier stacking insulation virtually eliminates thermal bridges.

top of the insulation layer is fixed parodiffuzionnoy membrane.This "multi-layer" installation of a soft roof with his hands to eliminate the ingress of dust mineral wool will prevent the accumulation of sediment on a heater.

material is laid parallel to the eaves with overlapping layers of 10-15 cm. In addition, the contour of the bottom of uteplniya should go about 15-20 cm membrane.Fastened material staple gun, the joints are joined with masking tape.

Harvesting plenum and installation of shingles

ventilation layer between the base and the roof insulation should be at least 5 cm. This is enough to normalize the temperature and moisture vapor removal.Mounted second layer kontrbrusa parallel rafters.

to work with the parameters used timber 5x5 cm, the distance between adjacent supports - 30 cm. The connection is performed with breaks in 5-10 cm, as shown in the accompanying photos.Further work on the arrangement and installation of the roof of the soft tile is performed according to the following steps below:

1. Over kontrbrusa fixed water-resistant OSB plate (with a gap between the sheets 3-4 mm, excluding differences in height of 2 mm).

2. Mounted hooks under the gutter at a distance of 60 cm for steel members, or 30 for copper.Held installing gutters, drip, caps.Mounted hopper itself gutter risers.For more information about installing the drain.

3. Held laying of waterproofing material (transverse overlap - 20 cm longitudinal - 10 cm), including sealing the seams with mastic asphalt.

4. Implemented roof layout, styling held a soft roof and its fixation ershennymi galvanized nails.

5. Held styling elements of the ridge shingles.

carried out to install a soft roof is correct, it is recommended to explore further applied to the video article.The lesson materials are detailed fixing rules, particularly methods of styling.

Completion

Considered mount technology may include various types of roof ventilation: aerators (special or standard), the ventilation grille or horse, vent caps on the towers, ventilation outlets, turbine, soffits.

hold closed adjacency to the walls and the chimney top (or upper and lower) slats.Implemented by installing roof window from the outside of the waterproofing on the flue pipe is installed protective cap.Running filing gable soffits and curtain hangers, snow guard carried out the installation.Each of the above steps is considered in detail in the attached video installation of shingles.