Build Daily

Restroom

August 12, 2017 18:05

How to close the pipe in the toilet

Appearance toilet, bathroom only win if all the utilities are located in these areas, will be the most hidden from view.The problem: how to close the pipe in the bathroom, can be easily solved by using readily available materials.Such work is quite simple to perform with his own hands.

Content

  1. How to close the pipe in the bathroom plasterboard?
  2. Materials and tools
  3. Step by Step Photo
  4. different options
  5. Video how to hide the pipe in the toilet

How to close the pipe in the bathroom plasterboard?Closure

pipe in the toilet may perform a variety of ways.The following recommendations will be given to do this, using sheets of drywall and profile system.In this example, simultaneously with the masking pipe installation system for closing the toilet is performed.

In typical houses modern buildings as well as buildings that were built during the Soviet era, as a rule, a system of water and sewer pipes located in the corner of the room.This allows it to sheathe plasterboard, staging a frame of galvanized profiles as angulation.

Materials and tools

Getting Started, you must purchase the required construction materials and tools.

From the materials you need to buy:

  • moisture resistant plasterboard wall;
  • set of profiles for gypsum board;
  • dowel-nails quick installation of the required length;
  • screws, for the connection profiles and for fixing plasterboard;
  • mix for grouting in the drywall;
  • hatch for access to the counters;
  • sound insulation for pipes.

Of the tools you need to have:

  • puncher with a set of drills;
  • screwdriver;
  • knife for cutting drywall;
  • hammer;
  • tape measure, level and plumb, square and building;
  • marker or pencil building;
  • small spatula;
  • planer for plasterboard.

Step by Step

1. Starting to sew up plumbing pipes in the toilet, the walls, ceiling and floor are applied to mark locations for the installation profiles.This procedure is performed in view of the fact that the skeleton assembled subsequently close all pipes and the tank for the toilet, and then, all of this will be to finish using the tiles.

2. The next step is to build the frame of the profiles.Initially, with the help of dowel-nails, you will need to install a profile on the walls, floor and ceiling at the marked lines, attaching to them rack profile with the help of cross-sections.

3. In the place where you plan to install the hatch-audit services for the counters, as well as withdrawal from these readings should be performed taking into account the hatch frame sizes.

4. The frame should be sew with plasterboard, which previously retained all the necessary holes.

5. For sewing the installation of the toilet, it is necessary to equip the frame of the profiles covering the entire structure, leaving only the conclusions under the sink and drain water control keys.

6. After drywall installation, all seams and head screws need to seal the putty.

7. After completion of the work described above, you can perform the final finishing of walls toilet.

Using videos and photos on our website, the owner of the property without any problems will be able to independently perform all the work on sewing engineering constructions in the closet.

Photo different options

Video how to hide the pipe in the toilet

instagram viewer