The foundation TISE own hands

click fraud protection

Foundation TISE (individual construction technology and environment) - pier foundation with unusual extension at the bottom of the supports.Has high load carrying capacity, may be made on any grounds.Suitable for the construction of frame, brick houses.Suitable for high-heaving soils: does not move, does not collapse.Build a foundation TISE can own hands.

Content

  1. foundation drawings and schemes TISE
  2. How to build a foundation TISE their own hands?
  3. TISE

Video building foundation technology foundation drawings and schemes TISE

many owners of country sites interested in what the foundation TISE.This type of foundation is similar to a conventional pile foundation.But thanks to the expanded bottom of piles has increased strength.It can be used to build houses near the road highways, railway lines: the vibration of the road will not affect its load carrying capacity.

Made foundation for TISE technology without the use of standard metal casings and holes for piles for it are created using a special drill.Rostwerk he is not adjacent to the land and is from her at a distance of 15-20 cm.

How to build a foundation TISE their own hands?

work should start with the markup site.Pegs indicated the location of the piles on the perimeter of the structure.Further notes the support for load-bearing walls.To create the precise layout you should use a water level.Between correctly exposed pegs stretch thread, marking the location of the poles.Further drill holes carried out under the piles.

for drilling is necessary to use a special device - a drill TISE.It is additionally equipped with a folding shovel, allowing to carry out the expansion of the pit.

to the ground is not showered in the process of concreting done "shirt" of the roofing material.

When all the holes drilled, is their fill with concrete.In the process of concreting is carried out reinforcement responsible for the strength of support.This requires the use of four rods each pile.They must act above the zero level by about 25 cm

further held shtykovanie -. A neat dive and rise in raw reinforcement solution.This will remove excess air bubbles.

After hardening piles, held their being covered with mastic for waterproofing.

previously harvested sand is distributed flush with the edges of the finished pile.Next, the construction of the foundation TISE performed using the following instructions:

1. Held thread layout for installation grillage formwork.

2. Set formwork panels are interconnected.

3. The interior of the panels upholstered film.

4. Additionally formwork sealed pins, which covers dress up as end sleeves.

5. Expanding and associated valves (4 valves rod 12 mm top and bottom).

6. Held casting molds.

day after the grout can be removed stud.To fully grasp raft foundation will take another 10 days, then removed the shields.The sand can be removed under the raft and put the flat panels of slate from both sides.

At this stage, the base of the preform is completed.But for more information before work is necessary not only to learn how to make the foundation TISE but visually assess the complexity of manufacturing.Therefore, you should view the photo and video material on the characteristics of the workpiece and the foundation to understand the accompanying instructions.