Build Daily

Engineering Systems

August 12, 2017 18:07

When the heating will Cheboksary in 2015

click fraud protection

As Cheboksary prepare for the heating season 2015?

In 2014, the head of the city administration Leonid Cherkesov held a series of activities will allow for a cold year with a minimum of breakdowns and low-cost.This experience has decided to use in the new year.Since the end of the heating period audited and elimination of breakdowns occurred during the operation of boiler heating equipment.The selected part of the budget was fully spent on repairs of heating mains.Preparatory activities allow just-in-scheduled interval - 29 September - 4 October to conduct the launch of boiler houses and connect them to homes and social institutions of the city.

Heating systems

From that graph of heat flow depends?

Terms incorporating heating systems Cheboksary depend on a variety of factors, chief among them:

  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

Today, 68% of consumers are prepared to start heating.Repair and preventive measures are carried out on time.Compared to the year 2014, 2015 heating season is not inferior to the quality of its training.

supply heating Priority Cheboksary

Traditionally, the first heat will have social institutions:

  • Hospitals;
  • Kindergartens;
  • College;
  • administrative institutions;
  • Houses.

Planned connection of residential buildings will be carried out gradually.Almost a week with a day of heating the heating system will go to each apartment Cheboksary.Accrual of utility bills will start from the date of occurrence of heat pipes in residential apartments and not a day of the boiler as a whole.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

Room Celsius temperature

optimal

permissible

Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

Whatdo if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.

Bills for heating

instagram viewer