Build Daily

Construction Site

August 12, 2017 18:06

Simple septic tank of concrete rings

Simple septic tank of concrete rings

When constructing sewerage systems for private homes pay attention to the septic tanks of concrete rings that are simple enough to build and easy to operate.

Long enough as a basic element of private home sewage systems in the country performing ordinary septic tank, but with its operation had to deal with a variety of disadvantages.

First of all, from her constant unpleasant smell, besides, she was in need of periodic cleaning.

Today, all of these issues are solved by a device septic tank made of concrete rings, carry out installation is possible as in the country, and near any private home.

principle of operation of the septic tank of concrete rings, which is equipped properly and according to the rules, will allow to cope with a sufficiently large volume of sewage.

In addition, you can build almost any place in the garden.

device septic tank of concrete rings implies the presence of ventilation, operation, scheme and design that allows you to virtually feel the odors on the territory of the garden.

addition, septic tank does not require constant maintenance and repairs carried out only when necessary.Before you make a septic tank made of concrete rings, it is necessary to understand the principle of its work and the device.

Contents:

  • Features of septic
  • device septic tank
  • Construction septic
  • final milestone
  • Tips and tricks

Features of septic

Of course, the price of a septic tank built of concrete rings,it is high enough, but it's worth it.You can try alternatives and to make installation of the sump of concrete rings.

In this case, the bottom of the well is done draining a mixture of gravel and sand, with the result that all the impurities will gradually go into the ground.

The device septic tank

Even if a single-chamber septic tank to make deep, it can not properly cope with large volumes of water, and the time it will have to be cleaned from time to time.

Such a device will solve all the size and depth of the well.In addition, there is a high probability that in the near future will soil contamination and groundwater close.

to not think about water consumption and when did not face the problem of discharge of sewage and sewage, need to think about a more efficient design.

optimal alternative is septic tank of concrete rings with their hands, the construction of which will consist of several separate chambers, as shown in the video below.

Video:

most common two-chamber septic tank made of concrete rings, assembly and arrangement which can implement each is the best solution to the problem with the sewage in the suburban area.

If all works are done correctly, it is possible to operate it for a long period of time.

In addition, there is no need to carry out regular maintenance and cleaning of the septic tank, and the repair is carried out only when necessary.

This design always keeps the soil clean and does not affect groundwater.In contrast to the well pit, septic tank, consisting of multiple cameras, practically does not emit odors.

The main drawback of this device is the high price of the materials used, as well as a rather complicated assembly.

well Sizes arrangement of this septic tank depends mainly on the number and volume of tanks, and these parameters are calculated before start directly installation itself.

For more information on how to make the installation of a septic tank made of concrete rings, can be seen in the video posted above.

device septic tank

classic and most common form of the septic tank, which effectively cope with the large volume of sewage is a three-chamber design, as shown in the photo below.

Optimal device

diagram of this design means the device a certain well, which will consist of three separate reservoirs.

Each tank serves a specific function and has some features in the structure.

Thus, the main and the main chamber in this case is the first, which receives all the sewage and sewage.

Its sealing must be performed maximally closely, as this is where the decomposition and separation of sewage will occur.This

tank processes as a result of the decomposition of certain microorganisms and bacteria, which leads to the separation of all kinds of gases and alkali and, consequently, their complete disintegration.Next

reservoir also serves for aerobic fermentation of microorganisms, but in this case, sealing is not as dense, and the air is involved in the process.

is permanently natural decomposition of bacteria, the major elements of which settle to the bottom and eventually rot in the chamber of the well.

Last reservoir has a monolithic floor, and out of the remaining sewage through the drainage system go deep into the ground.

is worth noting that in the reservoir of the well fed almost pure water, which poses no threat to soil and groundwater.

All tanks in a special way connected to each other by a special overflow system.Also, be sure their waterproofing must be done.

big role in the construction of this unit plays a septic tank ventilation of the concrete rings that settling on a particular principle.

approximate scheme of the septic tank of this type is shown in the photo posted below.

Driving septic tank

Construction septic

All work on the device to start digging septic pit under each concrete ring separately.The amount of such pits have to be a little more in their diameter than the size of concrete rings.

Digging wells is carried out in a specially prepared for this place to be located at the highest possible distance from residential buildings and underground waters.

It should be noted that the positioning ring can be made of concrete in one line and a triangle.

After the pit will be dug, it should be possible to strengthen the edges and thoroughly compacted bottom of each.Next, fill the base made of two wells with cement mortar.

is mandatory must be made waterproofing pits base, as this will help to avoid negative consequences in the future.

seal the bottom of the pits can be any intended materials for these purposes.

After the bottom of each hole will be prepared and made their waterproofing, carried out installation of concrete rings themselves.Rings neatly placed into pits each other.

further performed a thorough sealing and waterproofing joints between them, but other than that verified the installation rigidity.

In this case, seal the seams can be both resin and special grease.

It should be noted that the bottom of the last tank must be a drainage system made of a mixture of sand and gravel.

Video:

should also be thoroughly and tightly fill the space between the concrete rings and the edges of the pit.

After that, you must carry out installation of an overflow system that will interconnect all the tanks.

septic exemplary diagram of the device and the connection between each tank is shown in the photo in this article.

final milestone

After you have carried out the installation of concrete rings, and made their waterproofing, start laying sewer pipe itself.

Under her dig a small pit, which also need to be sure to seal the.The pipe should be tightly connected to each other directly and home septic tank itself.

order to, if necessary, repair the internal construction of a septic tank, it is necessary to provide appropriate technological holes.

They shall ensure free access to each well to repair and clean the septic tank if necessary.

What follows each tank cover with a special cover and arrange all the rules of the ventilation system, which will go through all the accumulated gas in the internal volume.

Despite the fact that repair and maintenance of septic tanks of concrete rings during its operation is rarely performed, yet this may be necessary.

In most cases, repairs may be required connecting overflow pipe and sewer pipe that connects the tanks to the house.

They need to provide maximum access, which will perform all the necessary scope of work.

occurs extremely rarely a need to repair the bottom of the septic tank, but to avoid this, it is still in the construction design carefully check its integrity and strength.

For more information on how to build a septic tank with concrete rings, described in the video.

Video:

Tips and tricks

use as a key element of the design of the septic tank of concrete rings, avoids a number of problems with its subsequent operation.

Primarily, such rings are subject to corrosion processes.It is well withstand high pressures and can be operated in a variety of soils.

main disadvantage of concrete rings is their relatively high price, but the durability and reliability of the septic tank, which was built of them, yet makes a sound design.

should be noted that a septic tank almost goes down during the entire time of operation, which means that repairs can be required very rarely.

In addition, to build a septic tank of concrete rings with their hands can anyone who has a relatively small construction experience.

construction of a septic tank of concrete rings at their summer cottage can effectively solve the problem of mounting sewer system.

This device has good reliability and durability, which enables to exploit it for a long period of time.

Video:

Such a septic tank to successfully cope with the processing of a sufficiently large volume of sewage, which means that it can be furnished and there, where a large and friendly family.

Work on its construction should be carried out in strict accordance with standard technology and use with only high-quality building materials.

worth noting that the concrete rings are the best material from which can be made a septic tank.