Build Daily

Adjoining Buildings

August 12, 2017 18:06

Children's playground with his own hands

click fraud protection

For many parents, the purchase of the game to give the complex - a luxury.However, to make a full playground with slides, stairs, balconies, rope swings and manhole can be their own hands.This will help you follow the instructions.There are many detailed pictures, so no problems with the manufacture of structural components and their installation will not occur.

Children

Children's playground with his own hands

ready to work

Article Contents

  • 1 ready to work
  • 2 Making support
  • 3 Making stairs
  • 4 Makinghill
  • 5 Making floor and railings
  • 6 Making the basis for swings and manhole
  • 7 finish swing
    • 7.1 Video - Children's playground with his own hands
Playground structure to give

Playground structureto give

Playground in the country

Playground in the country

Children playground

Playground

for starters purchase required us material - planks 15h2 cm and 5x2 cm and beam sections 10x5 cm, 10x10 cm and 5x5 cm

.Prepare the following tools:

  • electric drill;
  • electric jigsaw;
  • grinders;
  • hammer;
  • roulette;
  • level.

In the process, you may need some additional things like screwdrivers, knife, etc.

Make

support Pre-prepare a draft of the future complex.In the drawing, specify the desired dimensions of each element of the system.Note the size of the existing building site.

Making children

Make playground

Then do the following:

  • cut into lumber on part for arranging the support legs and cross bars;
  • grind wooden elements;
  • polished wood impregnate antiseptic.

average length of support - 900-1150 mm.Order 80-100 cm of each leg will be embedded in the ground, about 10-15 cm above the ground remains.

Beams for poles

beams for supports

Beams for poles

beams for supports

The bars for the production of platform parts

bars for manufacturing

site details Spread the support elements on the site, in accordance with the project and form a skeleton - two side portions of our future complex.To use a compound of 8-10 mm diameter screws.Retractable them into the timber.Holes are closing plugs.

expose marginalia on supports, fixing in a pre-prepared pits.At this stage, we enlist the help of 1-3 persons.Marginalia exhibiting on level.Previously at the bottom of each leg is recommended to lay the bricks for better stability of the site.Installed support fall asleep rubble 10-15 cm and fill with concrete mix.

Exposed supports connect the bars.We reserve the fill to gain strength.

The wood is processed and wrapped with roofing material

Wood processed and wrapped with roofing material

supports

supports

Racks dug

Racks dug

Racks dug and connected to the cross member

Racks dug and connected crossbar

Making stairs

Production of stairs

staircase Manufacturing

While concretefreezes, we are engaged arrangement of stairs.Cut the lumber desired length.ladder design is extremely simple: 2 kosoura and stage.The steps do not be too high - a platform still children.

stringers contractible by means of pins.Steps fastened in the recesses and additionally fix with screws.

Production of stairs

staircase Manufacturing

-Ground supporting pillars for the future of the stairs.We maintain the right slope.Doing it is not too steep.The order of arrangement of support remains the same as in the previous section.

Production of stairs

staircase Manufacturing

trying on a staircase.Expose her level, attached to the base and fill it with concrete support.Painting the stairs.

Production of stairs

staircase Manufacturing

further manufacture railing.For this exhibit vertical rack made of beams, fasten them to the stairs, and then fasten the rails.The top rail of the board and do fastened at a height of about 90 cm, the second rail anchoring approximately midway between the upper railing and stairs.For its production can use timber 5x5 cm, 5x2 cm, or another similar section.

Ready ladder

Ready ladder

Make hill

What a playground without a roller coaster?Make her!Ready to spend on plastic will not descend.With metal also will not mess around.Making pile of wood!

First we collect the hill, and then attach it to the base.Recommendations for floor laying will follow.

To produce design we need the following material:

  • timber sizes 70h10h5 cm - 2 pieces;
  • board 220h15h2 cm - 5 pieces;
  • timber 45h10h5 cm - 5 pieces.

Of the three boards we will make the basis for the descent.Plane down to the board of the same thickness and carefully grind.Then directly on the surface of battened with bars.Fasten the top - so we can draw boards to the beam as much as possible qualitatively.Mounting brackets recessed into the wood.Groove obscure filler for wood.We give it to dry, and then once more carefully grind the whole hill - it should be as smooth as possible.

basis did.Getting to the manufacture of the side portions.Determine the angle of descent.The top floor of our game complex will be located at a height of 130 cm. Therefore, the descent angle is about 55 degrees.Next take

side portions and cut in their upper part so that the elements can be installed on the floor of the upper floors of our children's complex.Below a cut at 55 degrees.

The cut for mounting slides

cut for mounting slides

Next, attach ready marginalia to the bottom of our hill (to the bottom of the beam) and further self-tapping screws to the end sides of the boards.

zashlifovyvayut sidewall, getting rid of sharp corners.In addition, round out the board in length to the kids it easier to hold on to the sidewall during the descent on the hill.

remains only to paint the product.You can cover it with stain and then - paint.

Sanding and staining

Sanding and staining

hill

Gorka

Now we need to install the finished pile.To do this, concreting in a pre-dug wells of the timber support.Suitable material dimensions 70h10h5 cm. The wood is impregnated with an antiseptic.

hill

Gorka

basis hills combine with stands and gaming complex with screws.

hill

Gorka

Making floor and railings

floor of our complex game spread from boards 15h2,5 cm total length of the floor -.. About 2.5 m before laying the floor frame is attached to the complex stiffeners.For their manufacturing suitable timber 5x10 cm.

At the same stage are building from the end of a vertical ladder.use strips 2x5 cm for its assembly. At the end of this ladder hang near the rope.Recommendations for the Development of the railing have already been given previously.Him and follow.From the stairs instead of railing boards mount 5x10 timber for arranging the manhole.

Do basis for swings and manhole

Making the basis for swings and manhole

Making the basis for swings and manhole

At this stage, we will gather and establish a support structure for the swing and equip a manhole.Prop upper beams do cross - so stable.Pre-make sample for easy docking bars and further contractible their bolts.Above the pillars laid and pressed clamp crossbar.Fasten it to the support.

Making the basis for swings and manhole

Making the basis for swings and manhole

Roy pit for racks.Set them props, carefully calibrated for each level.At the same stage is screwed to the strut tower bar - they will not give supports displaced during the hardening concrete.Fall asleep to the pit stands a thin layer of gravel and concreting.

Pit Rack

Pit Rack

While pouring concrete is gaining strength, produce a manhole.Bias do almost vertical.Steps and recesses settle in its sole discretion.The holes cut out using a jigsaw.Hole myself doing OSB and fasten it to the frame from a bar 5x5 cm and 5x2 cm crossbars.

Installing racks

Installing racks

Installing racks

Installing racks

Equips a balcony on the top floor.To do this, stowed and secured cross Flooring and erect the roof up to the stairs.From the hills fasten the wall from a sheet of OSB.To make it more beautiful, cut out a small window in it.The balcony railings are doing.

Wall

wall

Wall

wall

Wall

wall

Wall

wall

zashlifovyvayut all installed at this stage of the wooden elements.Sharp corners and edges is rounded.We cover all the varnish.

To fasten the manhole-bars projections.With a convenient location we tie the rope.

Fixing the boards on the house roof

mount boards on the house roof

Boarding house

Boarding house

finish swing

basis for swings we did in the previous steps.Now we will finish construction.Putting the bench with seat and backrest 130h50 cm height of about 30-35 cm. The dimensions can be changed to your liking.To fix the seat is convenient to use a chain or rope - suspended on their bench to the bar and you're done.

seat is securely attached at this stage, sinceat an earlier installation will prevent the bench to equip the rest of the design elements.

This is our playground is ready.It remains only to paint elements of the complex at its discretion.

Area

Area

Area

Area

Area

Area

Swing

Swing

Swing

Swing

Swing

Swing

Swing

Swing

Follow the instructions, consult the photosand all the necessary work.

Decor for the site

Decor site

Decor for the site

Decor site

Decor for the site

Decor site

Decor for the site

Decor site

Decor playground

Decor playground

Decor children

Decor children's playground on

cottage

Successful work!

Video - Children's playground with his own hands

instagram viewer