Heating furnace brick - two heating in one

click fraud protection

brick Heating stoves - what would it be?

Wood heating brick kiln mainly worked from October to April.Their dimensions are quite impressive, and the weight up to several tons.Now they were replaced by brick ovens heated with water in which to accumulate and heat transfer water is used.

Heat capacity of such a carrier, compared with a brick, is much higher.In addition, the advantage of this design lies in the fact that for the full heating of the house, even in the most severe frosts quite twice-firing.Hot water evenly transfers heat from a hot oven for around the house, and the warm pipe will heat the room, and after the oven turns off.Convenient, is not it?But how to mount the boiler in it?

The easiest way - is the installation in the furnace water circuit.brick Heating stoves and their arrangement are described below.You do not need a lot of materials, and with this kind of work can overcome any boss.Besides the cost required minimum.

Heating oven made of brick - begin to build

have furnaces water heating mass advantages :

  • for the operation of the furnace with a water circuit suitable for various kinds of inexpensive fuel;
  • this oven copes with heating houses a large area;
  • it perfectly combined with other heating systems;
  • brick oven can be decorated with a variety of facing materials.

a furnace construction technology is distinguished by its simplicity.The structure itself is a standard cast iron stove, oven, chimney.For its construction using simple ceramic and refractory brick.Laying is performed on clay solution with the addition of fine sand or slag.

First spread the furnace base.After distillation of the fourth row is set grates, size 25 × 25 cm. On the fifth row of the window allowed for cleaning the interior space, in which subsequently are assembled door.At the same time set the boiler and fix it in the masonry.

Brick oven with hot-water heating - masonry from the boiler to the chimney

The highest point of the top of the boiler is welded pipe output heating.This setup will allow in the future to avoid the formation at the outlet airlock.In the sixth row is set door.Important in masonry - this is the correct bandaging of seams.The middle of the upper brick must always be at the junction of the lower.Seventh series of overlapping treatment of the door.In the eighth floor doing the two chimneys of the boiler.

Masonry is performed so that the boiler front and rear are not in contact with the brickwork.This clearance is made with the expectation that the heating boiler is slightly expands and increases in size.

The thirteenth row starts overlapping the bottom of the heating chamber.Running he made of refractory bricks.Fifteenth series ends overlap.The seventeenth is a determinant for the upper heating chamber dimensions.At the thirty-fourth series begins laying the upper horizontal channel of the combustion chamber.

Thirty-seventh and thirty-eighth series of overlapping roof boiler.At last, the smoke damper is installed.With the thirty-ninth series begins masonry chimney.This is such a simple and affordable way to build a brick oven with hot-water heating.