Build Daily

Engineering Systems

August 12, 2017 18:07

When will give heating in Irkutsk in 2015

As Yakutsk prepares for the heating season 2015?When

include heating in Yakutsk should be completed all repairs.At the moment the degree of preparation of heating mains, boilers, as well as objects of housing and social sphere is 99%.This means that soon yakuttsev delight warm.

In Yakutsk waiting incorporating heating

During the summer, work was carried out by flushing central heating systems.Not all areas of the city management companies faithfully carry out their duties.Repair of elevators nodes, as well as works on warming of central heating networks.When in Yakutsk will give heating, all acts of preparedness of housing facilities.Today resursosnabzhayuschie company has issued most of the documents.

Heating in Yakutsk is almost ready for launch

repair campaign included the replacement of 98 boilers in the summer, 215 pumps, as well as more than 40 units of burner components.Major overhaul of thermal insulation engineering networks.Already known the exact date of when to give heating in 2015.The mayor at the meeting, held on 10 September, called the date - September 14.Social institutions have already received warmly in this respect.Came the housing and communal services.Prior to the beginning of October all the facilities of the city must be connected to the heating system.

The apartments Yakutsk starts colder

From that graph of heat flow depends?

Dates inclusion of heating systems in Yakutsk depend on a variety of factors, chief among them:

  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

Yakutsk city administration has allocated in 2015 for the repair and maintenance of heating systems have enough money to finish in time for the preparation for the heating season.

today to start heating 99% of consumers are prepared.Repair and preventive measures are carried out on time.

supply heating Priority Yakutsk

Traditionally, the first heat will have social institutions:

  • hospital;
  • orphanages;
  • school;
  • kindergartens.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

room temperature Celsius
optimal permissible
Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

What if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.

instagram viewer