neat finish cap serves to emphasize the style of the house, in addition to protect the foundation from moisture, atmospheric effects.Carrying out work using siding - an optimal solution to the problem.The panels have a stylish look, easy to install and connect.This finish cap with his hands is done with minimum effort and time.

Content

  1. Preparation cap to install siding
  2. Step finishing instruction plinth siding
  3. Video finish plinth siding with their hands

When selecting a suitable type of material it is important to take account of its characteristics.A special ground siding has a high strength, provides reliable protection grounds.The panels have a design under a stone or brick, which improves the structure of the exterior and make it unique.There are models with different textures and colors.But the specifics of fixing compound elements they are absolutely identical.

cap Preparing to install siding

correctly carry out work on the installation of panels allow proper preparation base.It must be absolutely smooth surface.Otherwise, accurate finishing of the foundation plinth siding will be carried out with certain difficulties.you need to prepare the frame for fixing panels.In the case of irregularities critical foundation to establish exactly the support it will be impossible.Therefore, any projections recommended to gently remove.

Then you can proceed to the construction of the frame.For this task, it is recommended to apply the metal profile.Beam as a support is not as good: it has a lower durability can be deformed with time.Profile last longer.It is attached to the cap by means of dowels and screws.It is recommended to use products with a length of about 10 cm Positioning profiles are needed in three rows:. Top, bottom and middle.This mounting method is suitable for home decoration cap in one panel (approximately 46 cm in height).

Step by step instructions for finishing plinth siding

To secure the panels need to procure additional elements: the start bar, angles, sills.Buying supplements shall be carried out according to the size and shape of the installed siding.Following the acquisition of elements, studying photos and video lessons, you are ready to finish the installation as follows:

1. Mount launch bar on the lower profile.The distance of the upper edge of the strap to the bottom of finish should be about 4 cm.

2. Mounted external and internal corners.They will carefully carry out the transition between the different bars without breaking the aesthetics of design.

3. Mounted on the first sheet of siding.It is set in the start bar, attached to the top edge of the previously harvested crate.

4. Set the second bracket.It is impossible to fix her "butt" to the first element: the expansion of the material can lead to strain on the joints.

5. Next, you siding siding remaining sides of the cap.When installing panels on the corners may require trimming.

6. After a complete installation of the base trim is held low tide: the element is mounted on top of the siding, closing it, and the gap between the panels and the wall.

described the foundation of a basement lined siding after the installation of additional elements of the last to be completed.But experts further recommended to take care of the cap proper ventilation.It is pre-cut panels in several round holes.After the installation of siding held closing holes with metal grids.

Using the siding for the cladding plinth justified practicality and low cost material.It is resistant to moisture, does not fade, it can not be deformed.It allows you to securely protect the foundation of a private house and prevent its destruction.Therefore, the use of ground siding - a profitable and practical solution for any decoration in size and shape of a house.