Build Daily

Construction Site

August 12, 2017 18:06

Construction of the foundation for a fence with brick pillars

click fraud protection
Construction of the foundation for a fence with brick pillars

In order to protect the house reliable and durable fence, which also will have an aesthetic appearance, it should first of all think about the construction of the basement under the fence with brick pillars.

Any private structure to protect against unauthorized persons must have a fence around the perimeter.

addition, construction has architectural significance and should be in harmony with all the buildings on the site.

Currently, there are a huge number of different types of fences, each of which has its advantages and disadvantages.

First of all, any fence needs to be durable and reliable, and in addition to this long-lasting, and that fence with brick pillars to the greatest extent meets all these requirements.

This structure has a high strength, optimal reliability and has an attractive appearance.

In addition, the cost of its construction is relatively not large and can be accessed by the majority of owners of private homes.

A prerequisite of building such a fence is the existence of the foundation, which can be erected at the correct approach alone.

Contents:

  • Features and types of foundation
  • Base belt type
  • Belt columnar base
  • foundation stone type

Features and types of foundation

general, the main purpose of any foundation - is holding kakogo-or the structure in one direction for a long period of time.

When erecting a brick fence, built by his foundation will distribute the load evenly around the perimeter of the fence and do not give the opportunity to move under various influences.

Driving foundation

Properly constructed foundation will further strengthen the rigidity of the whole construction of the fence and protect it from settling, and accordingly, and destruction.

concrete base such depth is determined based on the size and weight of the pillars themselves material sections, but has a relatively small amount.

This fence has aesthetic appearance, and to carry out sections of the installation can be of virtually any material.

worth noting that the guards, who are the foundation, have a high resistance to wind loads.

Additionally, the foundation can be oblitsevat variety of decorative elements that will make it look even more attractive.Under

fence with pillars made of bricks, you can build several different types of foundations.

One of the most common types of foundation, which has been successfully used for fencing with pillars made of brick, it is believed the tape.

Its width is determined by the width of the columns themselves, and the depth, generally not greater than fifty centimeters.

After pouring the concrete foundation of this type is obtained a solid monolithic tape around the perimeter of the territory.

Video:

also for the fence, which will have a brick support in the form of columns, pier foundation can be build.

In this case, only fill in those specific places where they will be located directly own pole-support.

should be noted that this type of foundation is possible to equip only on stable ground and in the case where the section will be relatively lightweight.

also fencing with pillars made of bricks frequently used combination belt columnar and stone foundations.

latter type of foundation does not need to hold the reinforcement and is made of stones of various sizes and shapes.

Base belt type

If erected fence will have brick pillars, the best solution for him would be the foundation of concrete belt type.

will prepare the territory and to hold the layout Before you start you need to fill a base.

For this pegs are driven around the perimeter, between which stretches the cord is released from the soil debris and leveled.

depth of excavation under such a foundation must be at least fifty centimeters in view of the fact that on the surface he will be performing at ten centimeters.

Video:

width of the belt base is usually taken to forty centimeters.

Once the pit is formed, it is necessary to properly form the pillow, which should be used crushed stone and gravel.Next, you need to make base reinforcement.

To do this, two valves directly put on the bottom of the pit and the two strengthened in its upper part.In addition, the future foundation of enhanced cross-pieces of reinforcement.

To form part of the foundation that will rise above the ground, must be mounted and thoroughly strengthen formwork.

In the final result, should get a reinforced tape without joints, located in the inner part of the casing.Ready solution should be well compacted during the filling.

It is better to use special vibrator, and in his absence a piece of rebar, which must be regularly pierce in several places of the fresh concrete.

After you have completely filled in all of the future foundation for a fence with pillars made of brick, it certainly should be given time to grasp and complete drying, and only then proceed to the brickwork.

device pile-strip foundation, as well as the order of the work, shown in detail in the video posted above.

Belt columnar base

If you plan to fence with pillars made of brick and massive heavy sections between them, the best solution would be to fill a belt-type columnar concrete foundations.

his device is a bit like an ordinary tape base, but it has some significant differences.

First we need around the perimeter of the territory corresponding to dig a trench, the dimensions of which are determined based on the parameters of the future of fencing.
Video:

then be sure to mark the place of the future pillars of the location and additionally generate well under them.

Typically, the depth of such wells should be ten centimeters higher than the depth of the pre-dug pit.

should then be mandatory to lay on the bottom of a quality waterproofing, which you can use ordinary pieces of roofing material.

The next stage is the formation of a dense cushion of crushed stone and gravel, as well as the reinforcement of the future of the foundation around the perimeter.

Valves under a universal fence is placed at the bottom and the top of the pit, and the further increase in the well, where will be subsequently placed themselves pillars.

To the upper part of the base slightly rose above the ground, formed a small wooden decking all around.

Video:

directly at the place of location of the poles, it is performed in the form of a square of the appropriate size.

Next is the pouring of concrete, which should be carefully tamped to prevent the formation of air voids.

After the solution will rise well and completely dry, you can begin to build the pillars of bricks and fence itself as a whole.For more information about the order of the work described in the video posted above.

foundation stone type

To erect a fence with brick pillars and can be the foundation stone type.

Under this foundation, you must also dig a trench of certain sizes and form a special drainage bag, for which you can use gravel or crushed stone.

In this case, it is not necessary to carry out reinforcement of the foundation, and is immediately ready for laying stone and rubble.

Stone is adjusted maximally close to each other, and with the increase of his bed, slowly pour cement mortar.

ground part of the foundation must be done as carefully and precisely, have an aesthetic appearance.

With the formation of this type of foundation should always exercise control over its smoothness, as well as to check the density of the stones fit together.

erect pillars only after the clutch is well dries out and get stronger.

The same base can be formed from bricks using masonry.It also should dig a trench around the perimeter of the site and form a cushion.

cushion should be as smooth and dense.Further bricklaying is done, while in the lower part of the foundation is no need to seal joints.

Video:

This decision will allow the moisture to quickly go to the drain.It is recommended to perform a laying of the foundation in a checkerboard pattern.

Tu part of the foundation that will rise just above the ground, should be carried out carefully, constantly monitoring its evenness.Formation

pillars themselves begin only after complete hardening and setting of the cement.

It is desirable to produce a laying of brick pillars directly to the foundation.It is necessary to prepare the surface with the help of special tools.

themselves pillars should only red or special bricks.

qualitatively strengthen the pillars to help support in the form of metal fittings, pipe bracket or the corresponding section.

should also be tightly fill the entire space, which can form inside the pillars.Hung section of the poles can be ready only after the solution is completely dry and well rise.

instagram viewer