Smooth Floor facilitate laying of decorative coatings and prolong its service life.Coverings laid on a perfectly flat floor, are not subject to premature wear, aesthetically pleasing look and pleasing to the eye.

Align floor the old fashioned way, using a screed - is not easy.It is easier to use and special self-leveling mix more quickly.They are applied easily and quickly on the subfloor and allow to obtain an almost perfect surface.

Fill with a mixture of self-leveling floor

Bucket self-leveling floor mixture

principle attain a perfectly flat floor

technology self-leveling floors based on the law of physics: whatever turns a vessel with liquid, after the extinction of the surface of its oscillations become smooth as glass.When pouring self-leveling floors in the floor of the room, the mixture behaves this way - is aligned relative to the ground plane.It is not only smooth out the irregularities, but also eliminates distortions floor plane.

way about the floor screed with expanded clay can be read here.And about how to make the filling the floor with their hands read here.

Required tools and accessories

Also a special blend for the self-leveling floor will need:

  1. laser level;
  2. capacity for sufficient dilution of the mixture;
  3. wide spatula long-handled;
  4. needle roller with long needles, approximately equal to the thickness of the self-leveling floor;
  5. building mixer or drill with paddle to stir the mixture.

You will also need a pair of helpers.For all its simplicity, self-leveling floor technology requires coherence and efficiency of action, so better to make a fill-way, pre-distribute the work.

Preparations

In order to get a perfectly flat floor surface, it is necessary to prepare the ground.First you need to make sure that the floor does not have a slope in any direction.Convenient for this purpose to use a laser level.Large differences in elevation must be leveled using screed cracks and potholes filled.

After preparing and rough leveling floor must be cleaned of debris and dust.Using the vacuum cleaner for this purpose, you will save a lot of time.The joints between the walls and the rough screed must be dry and fluff sealant.

To improve the adhesion of the base under the self-leveling floor can be primed.When choosing the best primer guided instruction on the use of your chosen mixture for leveling floors to avoid the reaction of incompatible components.

Mixing

solution for floor leveling should be prepared in accordance with the instructions on the packaging.To obtain a uniform consistency without lumps need to pour into the prepared container and the required amount of water, stirring it continuously so as to obtain a funnel, pour the estimated amount of the dry mixture.The solution knead well with the help of the construction of the mixer or drill with a paddle, and immediately proceed to the floor casting.

The process of preparation of the mixture

process of mixing

solution fairly quickly hardens, so you need to cook the mixture in small portions.
sex Pouring

Fill begin from the far corner of the entrance to the room and move towards the exit.Breaks in the work can not be done - the mixture can grab and lose plasticity.The prepared solution is poured directly from the container onto the floor, and then distribute the trowel actively trying to stick to a desired thickness.Despite the fact that the diluted mixture has a good flowability in the corners and along the walls it is necessary to align.

After leveling coating should be rolled with a spiked roller - it will help remove air bubbles from it.The next portion of the solution is poured onto the floor next to the aligned and repeat the alignment procedure.

Sex is necessary to process roller that did not form blisters and bubbles

Paul to be treated roller so that no swelling and blisters

can not be allowed to solidify the mixture, otherwise the floor will be noticeable differences.That's why a team to work better: while one aligns the first portion of the solution, and the second is preparing the second and third rolls coated roller.

Drying and finishing

drying time depends on the type of self-leveling mixture, the thickness of the fill layer, the air temperature in the room.On average, the solidification process lasts for several hours, but the ultimate strength of your floor will get only a couple of days or even weeks.During the drying process, try to prevent drafts and humidity extremes, as well as a dusty environment.

By finishing can start after a complete drying of the floor.To check the humidity enough to conceal a small section of the film and stand for several hours.The appearance of the film drops of water, fogging say that the floor is not enough dried out.

Stack laminate, linoleum and other types of finishing on floor Self-leveling liquid floor - a pleasure.With the proper observance of technology will form the coating evenly, and the floor will serve you for years to come.