Given that the cost of construction of the foundation for any construction can be up to 40% of the total construction cost of each individual developer seeks to save on it.One way - the choice of the optimal type of foundation of the house.This is one of the reasons why the pile foundation are so popular in the private sector.

determine how much it will cost the foundation on piles, can only approximate, because it depends on several factors, of which the parameters are different for each building.This is due to the project, the features of the soil and the like.Let us consider that the impact on cost and on what can be saved:

Materials

As a rule, used as supports screw piles plant production.They are of different lengths and cross-section, so you can focus on the price range of 900 to 2 100 rubles / pcs.

Additionally

  • headroom metal - from 220 rubles / pcs.
  • extension (if necessary) - 450 rubles / rm.

scheme




drawing up an estimate, each pile must "pledge" of about 2 800 - 3 000 rubles.But their number is determined not only by the dimensions of the structure, but also supports the scheme of arrangement, including, and the distance between adjacent products.Generally, spacing of about 1.5 - 2 m, plus one in the "nodal" points (angles seat abutting walls, partitions, location boilers).The total costs of the support is easy to calculate.

Those interested in the little things, you can add here the cost of the electrodes for welding, primer and paint for the treatment of joints and so on.Therefore, and noted that about 3 000 APPROXIMATELY.

project

Feature One of the disadvantages of pile foundation - cold floors on the 1st floor, because under the house, "the wind howled."With a view to additional warming often hosts immediately mounted and raft foundation (this is the base of pile-tape).How to do it - is another question.Some methods described here in detail.Therefore, the cost estimate must take into account the costs and these materials - wood, penoplex waterproofing.Perhaps, brick, if you expect the construction of masonry walls of the single-row + solution.All this is easy to calculate and view the cost of supplies on the Internet.

If the "tape" will build employees, that their services have to pay from 2 250 rubles / rm.(Depending on the height, with the excavation).

installation method

Pile - foundation One of the advantages of these foundations - the ability to quickly carry out all the work on their own.On average, it will reduce costs by approximately half compared to hiring professionals.

Specialized organization for the installation of the pile 1 will take at least 3 250 rubles.This, together with the installation and cementing the well head (320 + 105 rubles).

Total

* Indicative data for a small structure of 6 x 6 (professional services).

  • pile foundation - 35 000 rubles.
  • C raft - from 105 000 rubles.

For a more detailed cost estimates indicate average prices for some materials:

  • cement - from 190 rubles / pack.(25 kg);
  • ASG - from 300 rubles / m³;
  • bricks - from 14 rubles / piece.

Conclusion - significant savings can only be achieved if all the work on the arrangement of the foundation to fulfill their own hands.