Build Daily

Engineering Systems

August 12, 2017 18:07

When will give heating in Taganrog in 2015

As Taganrog prepares for the heating season 2015?

repair the heating system in the city virtually came to an end so when include heating Taganrog, management companies should not be faced with adversity.As a rule, the preparation for the heating supply finished first in the educational and medical institutions.After all, when in Taganrog will give heating, these objects are the first to get it.For all social institutions received passports ready and waiting for the heat supply.

In Taganrog continues preparation for the heating season 2015-2016

With regard to housing, there is work completed by 95%.Many management companies have confirmed 100% readiness of residential buildings.When the need to give heating in 2015, all homes must be in possession of documents confirming readiness for the winter.

To prepare the heating season Housing objects

During the summer, were carried out hydraulic tests of heating system of the city, repaired the equipment in Taganrog boiler.In view of the fact that for the last heating season water-bearing net worn, carried out the replacement of individual sections, in order to avoid local failures in the heating season 2015-2016.In addition, it required the replacement of dilapidated heating systems, the length of which exceeds 15 kilometers, as well as the change of the insulation.Replacement of insulation to avoid heat loss in winter.

Residents waiting for switching heating Taganrog

From that graph of heat flow depends?

Dates inclusion of heating systems in Taganrog depend on a variety of factors, chief among them:

  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

Taganrog city administration has allocated in 2015 for the repair and maintenance of heating systems as much money to fix up the cold weather all the defects of the heating system of the city.
Today, 96% of consumers are prepared to start heating.Repair and preventive measures are carried out on time.

supply heating Priority Taganrog

Traditionally, the first heat will have social institutions:

  • school;
  • kindergartens;
  • orphanages;
  • hospital.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

room temperature Celsius
optimal permissible
Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

What if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.

instagram viewer