August 12, 2017 18:07
When will connect heating in the mine, the city will be fully prepared for this.Today the mines are almost in full readiness for the heating season 2015-2016.All scheduled in late spring work coming to an end, in particular to the start of the season ready to boiler city, housing, heat lines, water supply system.Especially problematic in the repair work was heating main city, where the insulation has been replaced.In addition, subject to the replacement of worn-out sections of the heating main.
City in full provided the materials necessary for the elimination of accidents.To prevent errors and irregularities in the system on the water intake structures is carried out on a regular basis wash.To this end, the city authorities have acquired special pumping stations, capable of running on water.So when in Mines will give heating, the city will be protected.
When must give heating in 2015, all facilities should be 100% ready.That's why utilities, operating companies, as well as director of social services and educational institutions should ensure that by 1 October to prepare for the heating season.
Dates inclusion of heating systems in Mines depend on a variety of factors, chief among them:
City administration of the city Mines allocated in 2015 for the repair and maintenance of heating systems enough money, so the repairs promise to finish on time.
today to start heating 98% of consumers are prepared.Repair and preventive measures are carried out on time.
Traditionally, the first heat will have social institutions:
Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.
If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:
room temperature Celsius | ||
optimal | permissible | |
Spaces | 20-22 | 18-24 |
Kitchen | 19-21 | 18-26 |
WC | 19-21 | 18-26 |
Bathroom | 24-26 | 18-26 |
Corridor | 18-20 | 16-22 |
Entrance, staircase | 16-18 | 14-20 |
Pantry | 16-18 | 12-22 |
Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.
By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.
If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.