As Petrozavodsk is getting ready for the heating season 2015?When

include heating in Petrozavodsk, all the organizations that are engaged in the preparation for the heating season must obtain a passport ready.To date, the degree of readiness of the housing stock is more than 95%.Even works on flushing and pressure testing of the pipeline, although the preparatory activities for a long time had to end.

Connecting heating in Petrozavodsk

All repairs of heating mains will be finished when in Petrozavodsk will give heating.Recently, the mayor signed a decree on early heating season 2015-2016 and called heat filing date.September 21 - the deadline when all preparatory work must be completed.With this number, the heat will be supplied to kindergartens, schools, medical facilities.Closer to the October plan to turn on the heating in the residential area of ​​Petrozavodsk.However, the specific date of receipt of heat residential areas will begin only after the temperature drops to +8 degrees.

Repair of heat mains of Petrozavodsk is almost complete

But this is only the approximate date, because residential areas should be 100% ready when the need to give heating in 2015.Unfortunately, not all management companies fully coped with the task, not all the houses in the city have received certificates of readiness.

Residents of Petrozavodsk waiting heat supply

From that graph of heat flow depends?

Dates inclusion of heating systems in Petrozavodsk depend on a variety of factors, chief among them:

  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

Petrozavodsk city administration has allocated in 2015 for the repair and maintenance of heating systems enough money to have time to complete the repair work before the onset of cold weather.

today to start heating ...% of consumers are prepared.Repair and preventive measures are carried out on time.

supply heating Priority Petrozavodsk

Traditionally, the first heat will have social institutions:

  • school;
  • kindergartens;
  • orphanage;
  • hospital.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

room temperature Celsius
optimal permissible
Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

What if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.