Build Daily

Building

August 12, 2017 18:06

drain Arrangement of a country house with their hands out of concrete rings

click fraud protection

to build a country house - is not everything.Every home should be equipped with appropriate engineering services, providing its owners even basic amenities.One of these systems is engineered drainage system.Naturally, any work on the device of sewage country house begins with planning.

necessary to decide on the system diagram.Basically, do it in a private home can be quite independently, with their own hands, after having studied this issue.Large complexity of this work is not.You should know that improvement sewerage system consists of three main phases: installation of equipment inside the house, the construction of the outer piping system and cleaning item.

With regard to in-house equipment, it should be pre-define all the connection point to the sewer system.This applies to the rooms as the toilet, bathroom, kitchen.In general, a "plum" connect all water analysis site.It is necessary to determine not only the laying of the pipes inside the house, but also a place of installation of the central riser, and with the withdrawal of the pipe to the outside.

sewage - country - house - of - rings - 1

Experts recommend to use the sewerage system installation pipes made of polymer materials.For their pads and interconnect does not require any special equipment and tools, and special professional training is not needed.In addition, such pipes have light weight, long life, they do not corrode and are easy to assemble.If necessary, the faulty section of the route can be easily repaired by replacing a portion (pipe).




rules that must be followed when installing the sewer system inside the house:

  1. for installation and removal of the riser from the toilet used pipe diameter of at least 100 mm.To divert water from other places parse (.. Bathroom, sink, etc.) using the "fifties";
  2. if the pipe is rotated, the angle should not be straight.For angular pipe connections, use special taps or standpipes with such taps.The right angle is permitted only with a vertical docking tubes;
  3. installation of pipes is necessary to provide special equipment "audits".These are the holes in the pipes, which allow periodically clean the drainage system;
  4. with riser equipment must take into account that the upper end of the tube must be placed into the roof.This is to ensure ventilation keeps the room from unpleasant odor.Conclusion riser pipe should be not less than 0.5 m above the roof plane.Naturally, this conclusion should be the place to choose away from windows and doors;
  5. sewage pipes are laid with a certain slant to provide a natural flow of liquid;
  6. if pipes laid in the building from the outside, not in the walls to reduce the "noise" should be isolated (material film).

next stage - the choice of the type of treatment plant and its installation.The most preferred option is the construction of a septic tank cleaning.It does not require frequent calling assenizatorskaya machine and its installation can be done yourself, using the ring (of w / w or plastic) for the construction of the cameras.For the construction of septic tanks dug pit, which are stacked on each other ready-made ring.

Concrete collars for septic

When selecting a location for the treatment plant should be borne in mind that it should not be placed closer than 5 meters to the house.It should also take into account the depth of the groundwater.If the building will be used for concrete prefabricated ring, the required crane services, but will gain in time.

can cook their own rings, but the time it will take much longer.Firstly, it is necessary to make the formwork, reinforcement bars set.Secondly, a concrete solution will need to fill in portions, as if to fill in once the whole "structure", it is not qualitatively dries.Therefore, you should be guided by three weeks of such work.

sewage - country - house - of - rings - 3

should determine the amount of septic cameras.It is calculated based on the amount of waste water flowing throughout the day in the cleanup.If you allow the land area, the building is made of three wells, which are interconnected in series by special channels.The first plays the role of a well sump.It is with them and will, if necessary, to "work" assenizatorskaya machine (so you need to provide, it can drive up).

second pit comes secondary treatment water.The first two wells on a mandatory basis should be waterproofed.The third well is constructed without an isolated bottom portion.At the bottom of a filter installed drainage through which the purified water is drained into the soil.

remains to add that there are septic tanks and prefabricated, which can only be installed on site and connected to the sewer pipe.Pipes connecting the inner house and septic system must also be installed with a certain slant to the withdrawn water does not stagnate.You must correctly identify the depth of their laying.Open space (if any) must be insulated.Otherwise, during the cold season drainage will simply "freeze".

sewage - country - house - of - rings - 2

Video Installation of a septic tank of concrete rings:

instagram viewer