The application for electricity connection

basic rules of registration of the application for connection to the power grid.

Application for connection to the power grid to the future consumers of electricity need to be issued in two copies, one of which is sent to the address of the serving your area of ​​the network organization by registered letter with a list of all attachments to it, documents.If possible, the application with the package documentation should be personally attributed to the power supply for office.The application for electricity connection

If power for electricity consumption is not more than 15 kW, you must specify the following information:

  • passport data: surname, name and patronymic, and the series and passport number, when and by whom it was issued.Or data of another document that certifies the identity of the applicant;
  • place of residence;
  • name and location of electric energy receivers, which must be connected to the mains;
  • stages of putting into operation of electric power receivers, as well as the time frame in which this will be carried inclusion;
  • calculation for maximum power consumption of electricity.

Application for connection to the power supply, with power consumption up to 100 kW must include the following:

  • details of the legal person;
  • name and place of location of the power receiver to be connected;
  • indication of borders of territory that will house energopriёmniki;
  • stages of putting into operation of electric power receivers, as well as the time frame in which this will be carried inclusion;
  • category electrical and power distribution to each consumer of electricity;
  • largest planned capacity;
  • planned activity to determine the nature of the load power supply;
  • procedure for payment of services provided.The application for electricity connection

The application for technological connection of the following documents must be collected:

  • plan - scheme of the location of the receivers of electric energy;
  • electrical single line diagram of the consumer at a voltage of 35 kV, with possible rapid switching to its own sources;
  • list of tools to lock in case of possible errors in the conduct of on and off operations;
  • copy of ownership or other legal clearance on the territory.

Application for connection of communications

To connect your phone and the internet it is necessary, first of all, check the technical ability to install.To do this, you need to apply to an organization that provides such services to the population.After performing this procedure, there are two possible ways to resolve this issue: The application for electricity connection

  • first - if the technical possibility to connect the phone or the Internet is not technically possible, the application for connection is queued up to the appearance of this opportunity;
  • second - if the connection can technically be performed by the customer must fill out a form to connect the phone and the Internet.This statement indicates the applicant's passport details, the address to which you want to perform the installation, and you must provide proof of ownership.

The following is the procedure of signing the contract for the provision of telephone services and the Internet.Employees of the company producing the installation of telephone network in terms that make up:

  • no more than 3 working days - for the owners of apartments in urban areas;
  • and5 no longer working days for residents of the private sector;
  • not more than 7 days - for the suburban and rural areas.

If the connection is planned for more than 50 units, these time limits may be increased.The phone number entered in the help desk database.The application for electricity connection