What documents are required for the connection of electricity to the site

click fraud protection

What documents are required for the connection of electricity to the site

To connect the station to the mains need to write an application to join the supply line to the organization that controls the electrical backbone of the area.After filling out the application form, it is necessary to attach the following documents:

  • copies of your passport and a copy of the applicant's identification code;
  • ownership of the land;
  • technical area electrification project;
  • permission to carry out construction work, if they are planned.

Application can be submitted in person at elektroorganizatsiyu or sent by registered mail.It should be noted that the required original documents to confirm their authenticity.

какие-документы-требуют-для-подключения-электричества-к-участку-2

Technical conditions for connecting electricity to the site

After receiving the application, power company employees are required to give your area the technical conditions for the connection of electricity to the property.In preparing this document take into account a number of factors:

  1. power consumption of energy - the amount of power of all installed power consumers, multiplied by a certain factor, whose value depends on the operating conditions.
  2. view necessary mains - single- or three-phase;
  3. consumed voltage of 380V or 220V.

какие-документы-требуют-для-подключения-электричества-к-участку-3

After receiving technical conditions for connection of electricity to the site can perform the work on summarizing the cable network.If the load is, the planned use, the nominal or near the site is crossed by important communication and electrical supply is not possible, you will be notified about this in writing within two weeks.

cost of connecting

There are many companies offering their services to implement the power supply to the site or home.The cost of the connection depends on several indicators:

  • submission of an application and obtain technical conditions are performed with or without acceleration: 8,000 - 10,000 rubles.
  • simplified single-line diagram up to 15 kW - 4000 rubles.
    complete connection with the receipt of all approvals and documents "turnkey" - 65000rub.

Unauthorized and alternative power connection to the site

First of all, it should be noted that the electrical connection without the consent of the organization of the service network is illegal and is punishable by penalties.When unauthorized connection without permission, you may be disconnected from the power line, and the subsequent incorporation will be very difficult.
If unable to take stock of the electric line due to a number of reasons, you can use alternative sources:

  • gasoline generator;
  • wind turbine;
  • solar battery.

Which source is better - that is a separate topic worthy of coverage.