Sex in the sauna with your hands - turn-based installation technology

Flooring in the steam room with his hands - very important process.It's not just about the quality of work, but also the choice of material.Therefore, the issue requires a comprehensive solution.

For many millennia room was and remains the most widespread and beloved by many establishment.Where, if not in the bath can be great to relax after a week of work, improve your health, take off stress and, of course, calm the nervous system, restoring mental balance.So, purity and health - it is an invaluable result of bath treatments.

Sex in the sauna with their hands

floor in the steam room with his hands

Of course, it is very important to make all the structural components of the bath perfect that nothing spoil the overall pleasant sensation.

As a place to bath procedures can be equipped and Russian bath and Finnish sauna.In all of them the most important part - the steam room (or "steam bath"), and one of the most important elements of the design of the steam room is the floor.

How to choose a floor option for steam

Lifetime sex in the steam room in the first place depends on what kind of material will be chosen for him.Therefore, before proceeding to the arrangement of the floor, you need to analyze the pros and cons of a particular material, the important every detail.

The choice of material is also important in the case when the owner plans to lay the floor in the steam room with his hands.

One of the main purposes of structural floor in the steam room, in addition to the basics of movement, is to ensure water drainage into the sewer.And it is important to organize this drain properly.A selection of the material depends entirely on personal taste and preferences of each.

Thus, the floors in the steam room can be made of concrete, wood or clay base (rarely used).But they all differ in term of operation.

  1. Option - concrete floor

most rational, quite economical and has the most long-life material for the arrangement in the steam room floor is concrete.On such a basis it is quite simple to lay any suitable flooring that will match the desired functional requirements, aesthetic appearance have the corresponding planned interior.

example, concrete floors can oblitsevat tiled floors , which does not cause difficulties in cleaning.Excess water will not soak into the floor (it is water resistant) and will go through a specially equipped with a drain.

The concrete floor equipped with drain

concrete floor equipped with drain

A perfect solution would be laying grids of wood to tile .They are comfortable to stand (not slippery).lattice also dry quickly in the air and in perfect harmony with the wood trim throughout the sauna room.

often on a concrete foundation equips wooden flooring .Option perfectly acceptable (especially for lovers of natural materials), because over time, wood flooring can be easily replaced without dismantling with a concrete base.

  1. Option - wooden floor

This is a very popular and widely used version of the floor.Aesthetic and environmental properties - a huge plus in the direction of choice is a wooden floor.

However, there are shortcomings and natural: wood is subject to decay processes, and this leads to the destruction and unpleasant odors.Option with the processing of wood impregnated, of course, appropriate, but at the same time the life of more than five years have not achieved the floor will have to change.

is very important for high-quality wooden floor ventilation.Steam room must be aired frequently.

  1. Option - floor of clay

Sometimes the pair construct floor of mud, but here it is necessary to take into account that the clay is not absolutely watertight.A negative feature of clay - it is quite rapid swelling in a humid environment, and the ability to crack.Then the water can be trapped in the cracks, which leads to very unpleasant smell in the bath.This option is not the best, but much cheaper wood.

Construction of the concrete floor in the steam room

most successful material for arrangement of the base floor in the steam room is a concrete, on top of which you are laying the facing material.Consider the case of self-priming and finish flooring.

tools and supplies that will be needed to work

for all stages of work on the arrangement of the floor in the steam room will need the following tools :

  • concrete mixer;
  • container for mixing screeds solution (bucket, basin);
  • mixer;
  • building trowel;
  • shovel;
  • level;
  • rule;
  • needle roller structure;
  • roller (for priming);
  • gas burner with a balloon (solder roofing);
  • personal protective equipment for eyes and hands.

list of necessary supplies:

  • dry mixture of self-leveling screeds;
  • sand;
  • cement;
  • gravel;
  • primer;
  • edge tape;
  • roofing material.

special recommendation.Construction materials and primer advantageously select from the same manufacturer, it will provide additional strength and reliability of the structure as a whole.

Preparation of concrete solution and installation of floor

base for preparation of concrete solution is first placed in the mixer component parts in a dry form.Concrete - a mixture of cement with sand and gravel, are connected in a ratio of 1: 2: 3.

Fig.2 - Preparation of the solution in the mixer

Fig.2 -Prigotovlenie solution mixer

For enough of cement M200 or M300.Higher grades of cement in this case inappropriate, they will only increase the cost.

Then, the resulting mixture was diluted with water, while mixing thoroughly in the mixer and bringing it to the right consistency.

concrete solution should not be too liquid.

Fig.3 - concrete solution - consistency

Fig.3 - A solution of concrete - consistency

The room doubles on the bottom (ground), stacked sheets of roofing material, in this case it is needed as a waterproofing layer.

Fig.4 - Roll roofing

Fig.4 - Roll roofing

seams of roofing material to be brazed using a gas burner.

top of layers of roofing material evenly applied layer of concrete up to 100 mm.Concrete construction trowel first leveled and then the surface is leveled by means of regulations under the level.

Fig.5 The principle of leveling layer of concrete

Fig.5 The principle of leveling concrete

layer When the surface is completely covered with concrete, it is left to dry, and only then proceed to the next step.

finish leveling the surface

The next step is the construction of the floor finish leveling the surface, which will provide a completely flat floor with millimeter precision.The fastest and easiest way is to apply a self-leveling screed.

Pre concrete surface is cleaned of any kind of small debris and dust.

cleaned surface must be primed.This is usually a roller on it is applied a primer solution for better adhesion between the screed and the concrete foundation.Too porous surfaces should be primed twice.

Before performing work the lower part of the wall around the perimeter of the sauna paste special tape boundary.It does not give the screed stick to the wall and subsequently burst.

then preparing a solution of self-leveling screeds.A dry mix for the screed diluted with water in the prepared container, stirring with a mixer until smooth (no lumps).The ratio of water and a dry mix is ​​always indicated on the package.

Figure 6 - Tools for mixing liquid screed

Figure 6 - Tools for mixing liquid screed

resulting solution gently and evenly poured on a surface, starting from the far corner of the room.

grouted carefully rolled with a spiked roller, removing air bubbles from the screed.

Figure 7 - Roller for leveling screed

Figure 7 - Roller for leveling screed

final stage - the transition to the finishing

surface covered with self-leveling screed, leave at least a day to dry completely.

only after the screed has dried, proceed to finishing sex, ie,operate liner floor finishing floor covering.

On this surface can be laid and tiled covering and wood flooring.

If as a finishing material selected tree, then mount it to be processed by special solution with a moisture antiseptic properties.Impregnation must be applied in several layers.Installation only to be treated and permanently dry wood, which later can be varnished.

Video - Sex in the sauna with their hands

Fill strictly necessary to perform in a day.

instagram viewer