Pent roof with his hands - the design features

As is known, the construction of a pent roof is conducted with bias binding, however, as for other types of roofs.Attached is determined by the slope, mainly climate, typical of the area, and roofing material.Slope steepness can have up to sixty degrees with a large amount of precipitation, but not less than ten degrees, even for the dry south.Obviously, you need more materials than for small (with the same overlapped area) for steep slope.

Usually not widely in size buildings installation of pent roof being installed naslonnyh rafters of wood, metal and other materials.Naslonnymi called beam supported at its ends on two walls.Among them may be the outer one or two (in this case, the second, internal, should be capital).

Very often, considering the value of the passage of a pent roof structure is most appropriate for covering most of the outbuildings.Unsupported lean-naslonnye rafters good cover spans of up to four and a half meters.If the distance of five to six meters, this is necessary to strengthen the leg braces.

device pent roof with his hands for the span of six to eight meters will require the installation of special truss trusses with two struts and grandmother.Even large spans (up to twelve meters) can be overridden by using the intermediate support.This design is suitable even for residential buildings, but it is not widely used because of the resulting high "forehead" and related forms of a specific house.

How to build a shed roof - important factors for the calculation

As mentioned above, the recommendation of how to build a shed roof, take into account the climatic factor and roofing material of manufacture.This calculation must be carried out comprehensively: the distance that you want to block, and roofing material will determine the slope of the plane.

For example, if the structure is in the area of ​​large snow loads, and the top of the sheeting is planned, the flatter the shape can not withstand the pressure, therefore, it is necessary to increase the toughness.This in turn requires the relevant beams and lathing.

to navigate, how to make a pent roof, for most mid-latitude areas with temperate climate zone slope begins twenty degrees.With increasing latitude and increases this angle, reaching the north forty-five degrees (the reason - the abundance of snow).

makes their adjustments, and roofing material: metal, for example, requires a minimum of thirty-degree slope, corrugated asbestos cement sheets (slate) - up to thirty-five, flat - up to forty.In addition, there are minimum acceptable value is determined by the specificity of the docking nodes.

main element naslonnyh rafters - rafter foot.Focusing its ends serves as a reference beam, called mauerlat.It is usually placed on the inner edge bearing (external and internal) walls.Sami legs are in the form of logs, lumber, boards.Step placement for the log and timber ranges from a half to two meters, for plank - from a meter and a half.

Construction pent roof - individual stages of the nuances of

important nuance in the issue of how to make the roof of the Shed, can be considered mount beams through one wire (six-millimeter thickness) torsions on a crutch, hammered at forty centimeters below the cutoff wall.The ends of the beam cut into the supporting bar (mauerlat), such as a double tooth, and further clamps attached to it (it is possible to use a screw clamp or other means).Sam timber before placing subjected antiseptic treatment, and around the perimeter of its location close double layer of roofing felt (for waterproofing).

an important role in how to build a shed roof, the video material in this article is withdrawn quality and types of lathing .Indeed, depending on the type of roofing requires a different response to this deck.It is made of poles, boards, bars.Good quality is achieved if the rafters across the board to sew with a step up to a meter, and in this frame right up to lay a bar or board in the course of the slope.As a rule, under-roof floor unit applied trimmings such boards is better to have a tray up.So better chance drains moisture.

Yet for crates should take dry material is not lower than second class, without knots, up to fourteen centimeters wide.The present is considered to be of good quality if it does not bend under the weight of the worker has no irregularities, mounds, cracks (for their recommended roofing slab or asphalt).Decking board or other material, you need to have short fragments joints staggered.In addition, lathing is done, and still allowing for the attachment of the roof used, do not forget about it.