Build Daily

Building

August 12, 2017 18:06

Roof House - how to perform the installation of shingles with their hands , video

click fraud protection

work with shingles rather than a metal tile.However, we must bear in mind that the time it would take a few more.

The first stage of this work is the installation of the rafters.You can mount them directly on the ground under the tiles.However, if you apply as a basis OPS (of OSB) boards, they need to take a large enough thickness (about 18 mm), but they are quite expensive.You can make the base of the trim or decking.Second, by the way, it will cost twice as expensive.But this recommendation tiles manufacturers.

There are a few moments.

  • Firstly, boards are not exactly the same thickness and width, so you need to carefully select them.
  • Secondly, it is necessary also to dry thoroughly.And all this takes plenty of time.

Laying shingles

In practice, the first is a crate of edging boards (100 × 25 mm).For it is not so much matter an exact match their size.Batten boards are installed at a distance that is chosen at random, based on the configuration of the roof, the height of the attic and several other parameters.However, it is recommended that the boards are spaced no more than 30 cm.




On crate impose OSB.Suit 9 mm thick.Given the low cost of such thickness slabs and boards for batten, this method is more economical.Instead OSB someone suggests using a layered plywood.But we must note that it is more susceptible to moisture.

next stage - equipping ventilation.This system is different performance, so before starting work, the question should be examined separately.Much depends on whether the presence of the attic, or not provided.Next is the layout of the roof.It is necessary to guide when laying the lining and tiles.For that held both the horizontal and vertical lines on the entire roof surface.

installation , shingles

Next is the installation of the lining.She covered the entire surface on which the tiles will be mounted.Laying runs parallel to the edge of the roof and is made from the bottom up.Lining necessary to provide good additional waterproofing entire roof.Horizontal stripes lining must be stacked with some overlap.The upper band lies on the bottom with an overlap of 10 cm. This is to prevent the ingress of moisture in the lining.It attaches it to the crate using roofing nails.

Upon completion of this part of the work begins installing planks - gables and eaves.These trims will protect the edge of the crates.They are installed as overlapping and secured with nails
.Mounting directly

tiles being under the same system as the lining - from the bottom up, from the eaves edge.Cornice tile fits tight, butt, and is fixed by four nails.Heat-glued tiles ordinary tiles.When this is done overlay one another (approximately 1 cm).Ordinary tiles should fall so as to cover fully all the joints between the cornice.Before gluing ordinary tiles in the rear side, remove the layer of protective film.

installation - flexible - tile - 2

during operation will have to make the connection with vertical elements of the building structure (eg, flue pipe).For this first strip is placed on top - lining (on the adhesive paste).This is followed by laying ordinary tiles with "plant" on the edges of the vertical surface.Mounting - with mastic, too.On top of contiguity imposed "apron" made of metal and is fastened with silicone sealant.

must remember that before using all the building materials of wood must be treated with special solutions which protect the wood from mold, rot, pest destruction and burning.

Training video film for installation of shingles:

instagram viewer