Making layered plasterboard alone

click fraud protection

Content

  • 1 Preparation ceiling
  • 2 Marking upper level
    • 2.1 The video shows ways to bend the profile to the ceiling properly
  • 3 Installation of the second and subsequent levels
    • 3.1 Video shows kinds of two-level design of the ceiling plasterboard

Independently collect multilevel plasterboard is easy.Enough to have a bit of experience and perform all the steps of the installation sequence.But should warn that the lower ceiling levels are marked on the smoothed surface.Therefore, if the ceiling height in the room is insufficient for leveling plasterboard, you may have to leave as a top-level main ceiling, pre-straightened his plaster or putty.

Preparation ceiling

beginning with the ceiling need to remove old paint or whitewash.If you were glued panels, they must be removed and cleaned the ceiling surface of the adhesive residue.If there was a suspended ceiling, it is disassembled, removed all hardware and other items.if the original base of the ceiling to be curved preassembled single-level ceiling.

Marking upper level

markup begins with horizontal spacing.It uses a laser level.You can also use water, but the laser is more convenient and faster.

device must be put at the center of the room, turn on and wait until the beam rest.Next, the laser is directed alternately in the corners of the room, and made a mark on each of the converging walls.The obtained

risks kicking horizontal lines using paint cord.It is stretched tight between the corners, then the bit is pulled and released from the wall to produce cotton.As a result, the wall is a clear trail.For horizontal base this operation must be repeated on all the walls.

Since the first level - leveling, it should be as close as possible to the main ceiling.To determine its location, it is necessary to find the low angle, which Gaugeable distance from the ceiling to the horizontal base.Where it is the smallest, there is the desired angle.

Now, to get the line the first level of the ceiling must be:

  • put results on the corner of the ceiling of 4-5 cm (thickness of PP-profile plus a gap of 1-2 cm.);
  • measure the distance from the base to the horizontal made in the converging walls of the mark;
  • postpone this distance in the other corners;
  • connect derived tags, having beaten off the line masking cord.

next step is to identify profiles of ceiling fixing points.To do this:

  • on the ceiling along the long walls are put labels in increments of 400-600 mm.The layout should start from the shortest wall in the room;
  • is counting on a second, parallel wall from the same side, as in the previous step;
  • resulting compound marks, obtained by parallel lines along which outlines hangers fixing points in increments of 700 mm.

Suspensions are installed perpendicular to the lines using the anchor-wedges.

When installing tiered ceiling intermediate step between the first tier of the frame profiles must not exceed 400 mm, since it will carry additional load.In addition, this step allows you to install additional mortgages under mounting structure of the second tier.

next step - installation of ceiling profiles.They are inserted into the guide wall profile and fastened to the suspensions.To lower the brink of all-PP profiles are in the same horizontal plane can pull a fishing line or use rail-rule.In this case, first exhibited intermediate profiles that will serve as a Beacon.As it has already aligned the remaining PP-profile.

Instruments
Widget from SocialMart

perpendicularly mounted profiles crabs attached stiffeners.They also used the PP-profile.Ribs should be located on the site of the planned joints sheets of drywall.The right information, how to work correctly and quickly to the profile.

At the same stage set embedded profile for the frame of the second level, since it directly fastened to the drywall can not.Mortgages are set according to the drawing, in a pre-planned locations.

In this framework the first tier is ready and you can sew the gypsum boards.At the same time under each seam must be an element of the frame.By the way, important tips on how to avoid the appearance of cracks in the ceiling of plasterboard.

The video shows ways to bend the profile to the ceiling properly

Installation of the second and subsequent levels

From the upper tier deposited on the walls of the required height, and fixed guide profiles.It is necessary to take into account the thickness of the gypsum board.

According to the existing drawings on sheets of drywall upper level is marked lower circuit.Along these lines are fixed pre-prepared blank of PN profile.For straight sections - just pieces of required length.For curved - profile necessary to cut and bend to the desired shape.Between the rails are also installed stiffeners.

now made the sidewalls of the second tier of boxes.To do this, cut the drywall strip width required, taking into account the thickness of the plasterboard.These strips are fixed on the circuit already installed.These free edge of the inner side are fastened with screws PN-profile, which in turn are connected to additional wall guiding profiles.

lower-level frame is ready.He sutured plasterboard as well as top tier.

Subsequent levels are carried out in sequence as described above.Further videos will show in greater detail the assembly technology two two-level ceiling.In order to know how much material is required in the ceiling, use the calculator online, it will help to purchase the right amount of material.Next video examples to help.

Video shows the design of two-level types of drywall ceilings