How to change the pipe in the apartment with his hands ?Video

Before starting work

Check what summed up the pipe, requiring replacement:.. Bath, toilet, sink (in the bathroom and in the kitchen), bidet, washing machine, etc.

Draw a plan of the new system.It will help determine everything that is needed for the work: type, length, and number of new pipes, types of linkage arrangements.

Before starting work,

Do not make a mistake in choosing the right material will help the knowledge of some of the subtleties.For example, the toilet pipe must have a diameter of 100mm.Moreover, it is better if it is corrugated: it is much simplifies installation.Ribbed siphons for bath and sinks - the diameter of 32, 40, 50mm.For washing machine 20-25mm enough.

Professionals advise: purchase all materials from a single source.Thus, it is possible to avoid problems during installation when the pipes are adjusted and accessories.

Check availability of the necessary tools.Need:.. Punch, Bulgarian, chisel, hammer, wrench, screwdriver, mounting the gun (sealant), etc. Professionals advise: do not have to buy a gun mounting.Its quite replace the hammer: sealant squeezed inserted in his grip.

Before starting work,

How do I remove the old sewer pipe?

turn off the hot and cold water before working.Wait until the water stechёt all santehpriborov.After that, disconnect the plumbing.Free access to the old pipes: take out the toilets of all, what's to stop during operation.

pipes adjacent to the riser, remove.Stepping off the tee about 10cm., Cut the old pipe grinder and gently remove the remains or knock appropriate tools.

How do I remove the old sewer pipe ?

pipe residue can not be removed?In this case, around its circumference make cuts grinder.Gently tapping a hammer on the chisel, located in the incision, split jammed part.Good Clean socket tee.

Thereafter, available on the walls and in the floor uneven seal the grout and let it dry well.

Mounting sewage in

apartment during system assembly, experts advise to work "from the riser 'to the sanitary appliances.New rubber sleeve is already fixed in the socket tee with sealant.You can start the installation.

Installing the toilet - the most demanding job.It uses PVC pipe with a diameter of 110mm.It is important for a smooth transition to the smaller diameter tubes, using a "bridge" of 100 mm diameter.The discharge side of the gradient necessary to 5 °.It is advisable not to put adapters with an angle of 90 °.It is better to apply two corners at 45 degrees.

Installation of sewage in the apartment

assembly is not difficult: the tube is inserted into each other using gaskets that provide sealing.To achieve better results is better to apply silicone sealant, permanently connecting all parts.

testing for leaks

After installation is complete, it is important to test the system for leaks.To do this, plumbing appliances enable simultaneously.You can also dramatically pour a bucket of water in the bath, basin or sink.

If there is a leak, these places need to re-fix.Apply the special glue sealant on the problem areas, insert the pipe into the fitting, allow the glue to dry.Repeat the test for leaks.

By following simple rules, and accurately performing the work with quality materials, each with their own hands the host mounts a new sewage system.