Quite often you can hear the opinion that to do well in the country not impossible, but it is not.Let's try to prove otherwise.This material will be a statement by which it will be possible to produce their own work.Use the video of drilling the well with their hands and examine in detail each step of the process.

Content

  1. Removing the top layer
  2. Continued drilling Break aquifer wells
  3. layer
  4. Preparing pipes
  5. digging wells
  6. Setting rings
  7. filter well with their hands
  8. Construction of wells

Removing the top layer

The depth of this well will reach 7-10 meters.To work needed to manually drill diameter of 160 mm.First prepare the place for drilling.Firstly, it should be selected properly.Secondly, the fertile layer is removed within a radius of 0.5-1 m. It should be understood that the first layer is the most dense (perhaps clay).

On the other hand, the clay can be used as the clay lock.He tramples around the drilling site and will play the role of impervious element.Precipitation will not fall into the hole that is guaranteed to give a clean underground water.

Continued drilling

Not surprisingly, when the driller will come across different soil layers with different characteristics, such as density, color, grain.As a result, it is easier to drill, it is more difficult;on average, each layer - 1-2 meters (but this option is not necessary, and may multimeter layers).With the deepening of wells, lengthen the drill.

Break aquifer

soon come a time when they start to come across items with signs of moisture.It may be that this will be the penultimate or last aquitard, that is, until the water remains very little.In some cases, it turns out that a little water - well then increased to well, that is expanding.When there is water, as little as 30 cm in order to continue work.Next you need to measure the length of the aquifer, the parameters of the pipe will be selected for this parameter.

Preparing pipes

will suit plastic pipe, outer diameter 140 mm, inner 125 mm;wall thickness of 6.5 mm.(You should not be limited to these dimensions.) Connection - threaded.In some cases, it makes no sense to deepen the well, if narvёmsya on quicksand.We are talking about sand - well is swim and need regular cleanings.Therefore easier to continue to do well.

digging wells

for digging the well it is best to use a tractor with a bucket.(In our case -. From pile installation) In the well used concrete rings that you need to buy in advance.At a certain stage begins loading the first ring.To descend into the pit, you can use a regular wooden staircase.The edges of the rings coated with cement (for the clutch) and fall in the same tractor to the bottom.

Setting rings

Then begins filling the space of the ring.Concrete rings are connected by metal anchors to prevent the absorption of water into the soil.You can continue drilling into the mine pit, this option is the most acceptable.It must seem a mirror of water.Good apply this method: the well pipe insert hole larger diameter (available sewage), and it has a pipe for pumping of water (which was mentioned earlier).This will prevent the water from freezing during cold weather.It will also need a filter for the well, which can be made with your own hands, as in the video.

the well with their hands

Filter To create a filter need a long steel tube, which is perforated, caves, top wound synthetic fiber.The first layer of the fiber, then wrap the rope (nylon), then put the second layer, it is also wrapped with rope.

Construction of wells Construction of wells

continues further.Mounts pipe installed a hand pump, which control the pumping of dirty water.Next, an electric pump is installed.The important point!- The water must pass the examination to find out - it is drinking or technical.

We sincerely hope that the video in this article has helped answer the question of how to drill a hole with their hands.